Waskom ISD - Waskom High School - Main - Post 2000 buildings

  • Year Built
    2000, 2007, 2017
  • Square Footage
    115,000
  • Replacement Cost
    $79,399,588
  • Condition Budget
    $4,006,517
  • Facility Condition Index
    6%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Repair minor exterior masonry cracks and recaulk expansion joints where caulk is cracking. Clean exterior metal panels.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Repair/repave asphalt parking and drives.
Good
Site: No issues observed.
Fair
Doors: Repaint/refinish worn interior metal doors. Repaint exterior metal doors.
Good
Exterior/Interior Windows: Windows are generally in good condition.
Fair
Roof: Metal roofs generally appear to be in good condition; however, there are significant leaks at front entry hall of main building and other areas of main building. Have a roofing consultant perform a detailed inspection and then make all needed repairs to eliminate the leaks.

Interior

Fair
Interior Structure: Repaint worn interior walls. Replace any damaged/stained ceiling tiles.
Good
Plumbing: Plumbing systems are generally in good condition.
Good
ADA: ADA access appears adequate.
Fair
Furnishing, Fixtures, Equipment: FFE is generally in good condition. Repair any damaged toilet stalls.
Good
Electrical: Electrical and lighting systems appear to be in good condition.
Fair
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Flooring is generally in good condition.
Poor
HVAC: Replace 29 aging HVAC units. Rebalance system, upgrade controls, and repair ductwork with HVAC replacement.

Priority Projects

  • Significant leaks at front entry hall of main building and other areas of main building. Have a roofing consultant perform a detailed inspection, and then make all needed repairs to eliminate the leaks.
  • Replace 29 aging HVAC units. Rebalance system, upgrade controls, and repair ductwork with HVAC replacement.

Additional Projects, if Funds Become Available

  • Clean exterior metal panels.
  • Repair minor exterior masonry cracks and recaulk expansion joints where caulk is cracking.
  • Repaint exterior metal doors.
  • Repaint/refinish worn interior metal doors.
  • Repaint worn interior walls.
  • Replace any damaged/stained ceiling tiles.
  • Repair any damaged toilet stalls.
  • Repair/repave asphalt parking and drives.
  • Enlarge cafeteria kitchen to better serve student population.

Utilization

40% Capacity: Low Utilized

Capacity

Pupil Count

Student Enrollment

250

Functional Capacity

695

Facility Condition Index

FCI: 6%

Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Core Classrooms: Classrooms are modern and adequately sized.
Good
Visual and Performing Arts: Band and theater areas are adequate.
Fair
Cafeteria: Cafeteria kitchen is undersized to adequately serve current student population.
Good
Occupant Flow: Occupant flow is good.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Good
Site Playgrounds/Extra Curricular: No issues observed.
Good
Special Education: Special education areas are adequate.
Good
Physical Education: Gym is adequate.
Good
Library: Library is adequate for current student population.
Good
Administration: Office areas are adequate to serve the campus.

Actions to Improve the Educational Environment

The Waskom High School main campus buildings provide a modern educational environment for students. No major actions are needed at this time.