Waskom ISD - Waskom High School - Vocational Buildings (1966/2007)
- Year Built1966, 2007
- Square Footage25,000
- Replacement Cost$17,260,780
- Condition Budget$2,755,155
- Facility Condition Index17%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Clean and repair exterior masonry and metal walls.
Fair
Foundation: Replace splash blocks where missing below downspouts. Improve drainage between vocational buildings.
Good
Site: No issues observed.
Fair
Doors: Repaint exterior rollup and overhead metal garage doors. Repaint exterior metal doors.
Fair
Exterior/Interior Windows: Repair damaged window frames and trim.
Good
Roof: Standing seam metal roofs are generally in good condition.
Interior
Fair
Interior Structure: Repair and repaint worn interior walls. Replace worn and sagging ceiling tiles.
Fair
Plumbing: Replace aging/worn plumbing fixtures. Replace plumbing infrastructure older than 30 years.
Poor
ADA: ADA access appears adequate.
Good
Furnishing, Fixtures, Equipment: FFE is generally in good condition.
Fair
Electrical: Replace electrical and lighting infrastructure older than 30 years.
Fair
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Repair flooring finish were damaged. Clean and repaint worn concrete floors.
Poor
HVAC: Replace 15 aging HVAC units and upgrade controls when replacing HVAC units.
Priority Projects
- Upgrade controls when replacing aging HVAC units.
- Replace 15 aging HVAC units and upgrade controls when replacing HVAC units.
- Replace splash blocks where missing below downspouts. Improve drainage between vocational buildings.
Additional Projects, if Funds Become Available
- Clean and repair exterior masonry and metal walls.
- Repair damaged window frames and trim.
- Repaint exterior metal doors.
- Repaint exterior rollup and overhead metal garage doors.
- Repair and repaint worn interior walls.
- Clean and repaint worn concrete floors.
- Repair flooring finish were damaged.
- Replace worn and sagging ceiling tiles.
- Replace aging/worn plumbing fixtures.
- Replace plumbing infrastructure older than 30 years.
- Replace electrical and lighting infrastructure older than 30 years.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Fair
Core Classrooms: Many classrooms are below the recommended size of 700 sf minimum.
Good
Occupant Flow: Occupant flow is adequate.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Fair
Physical Education: Some old classrooms have been converted to locker rooms; these rooms are not well-suited for that use and must smells are dominant throughout.
Actions to Improve the Educational Environment
The Waskom High School old building is aging and does not represent a modern educational environment; replacement or major renovation is needed. The wood shop and metal shop buildings are fairly new and provide a good educational environment for the vocational shop programs.