Granbury ISD - Middle School - Granbury Athletic Facilities
- Year Built2001
- Square Footage3,050
- Replacement Cost$3,559,816
- Condition Budget$1,797,982
- Facility Condition Index112%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Fill open holes in wall surface, replace any cracking or missing caulking around penetrations. Check fasteners and flashings for tightness and seal on metal walls, repair or replace as needed.
Good
Foundation: No issues observed or reported.
Poor
Site: Repair uneven pedestrian paved surfaces to reduce potential tripping hazards.
Fair
Doors: Refinish interior and exterior hollow metal doors as necessary. Refinish interior wood doors as necessary.
Good
Exterior/Interior Windows: No issues observed or reported.
Poor
Roof: Gravel roof system is past useful life expectancy and should be planned for replacement. Check fasteners and caulking on metal (standing seam) roof system for tightness and seal, repair or replace as needed. Check fasteners and caulking on metal (R panel) roof system for tightness and seal, repair or replace as needed. All roof systems should be inspected at least semi-annually and after every significant weather event.
Interior
Fair
Interior Structure: Refresh high touched interior masonry wall finished surfaces. Replace 1x1 ceiling tile with a wall board ceiling surface and paint surface. Repair and refinish wallboard ceiling surfaces as needed.
Good
Plumbing: No issues observed or reported.
Good
ADA: No issues observed or reported.
Good
Furnishing, Fixtures, Equipment: Repair or replace aged or damaged cabinets and countertops as needed.
Fair
Electrical: Update lighting fixtures to LED.
Fair
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page.
Fair
Flooring: Deep clean, repair or replace aged and damaged vinyl tile flooring.
Poor
HVAC: Replace HVAC units at or past their useful life expectancy.
Priority Projects
- Gravel roof system is past useful life expectancy and should be planned for replacement. Until replacement can occur, the roof should be inspected at least semi-annually and after every significant weather event.
- Check fasteners and caulking on metal (R panel) roof system for tightness and seal, repair or replace as needed.
- Check fasteners and caulking on metal (standing seam) roof system for tightness and seal, repair or replace as needed.
- Check fasteners and flashings for tightness and seal on metal walls, repair or replace as needed.
- Fill open holes in wall surface, replace any cracking or missing caulking around penetrations.
- Deep clean, repair or replace aged and damaged vinyl tile flooring.
- Repair and refinish wallboard ceiling surfaces as needed.
- Replace 1x1 ceiling tile with a wall board ceiling surface and paint surface.
- Update lighting fixtures to LED.
- Repair uneven pedestrian paved surfaces to reduce potential tripping hazards.
- Repair and resurface track structural topcoat.
Additional Projects, if Funds Become Available
- Refresh exterior hollow metal door finished surfaces as needed.
- Refinish interior wood doors as necessary.
- Refinish interior hollow metal doors as necessary.
- Refresh high touched interior masonry wall finished surfaces.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Update football field lighting to LED.
- Regrade area around bleachers and add vegetation to eliminate water runoff.
Actions to Improve the Educational Environment
These athletic facilities support the district’s goals for student-athletes.