• Year Built
    2000
  • Square Footage
    7,000
  • Replacement Cost
    $4,069,910
  • Condition Budget
    $332,287
  • Facility Condition Index
    10%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: No issues reported or observed.
Good
Foundation: No issues reported or observed.
Good
Parking/Traffic: No issues reported or observed.
Fair
Site: Repair uneven pedestrian paved surfaces to reduce potential tripping hazards. Update playground equipment as needed. Add safety fall zone material as needed. Review and consider Safety & Security Recommendations on the Facility Details page.
Fair
Doors: Refresh exterior door finished surfaces as needed.
Good
Exterior/Interior Windows: No issues reported or observed.
Poor
Roof: Metal (standing seam) roof system has hail damage that should be evaluated to determine if replacement is necessary; however, the system does reach life expectancy in 2030. The recommendation is to replace roofing system due to condition and age. Until replacement can occur, the roof should be inspected at least semi-annually and after every significant weather event.

Interior

Fair
Interior Structure: Cracking observed in framed partitions of the interior walls, repair walls, and refinish surface; observe for movement. Repair and refresh high touched interior wallboard wall finished surfaces. Refresh high touched interior masonry wall finished surfaces. Replace stained or damaged 2x2 lay-in ceiling tiles as needed.
Good
Plumbing: No issues reported or observed.
Good
ADA: No issues reported or observed.
Fair
Furnishing, Fixtures, Equipment: Repair or replace fixed furnishings (cabinets or counter tops) as needed.
Fair
Electrical: Update lighting fixtures to LED. Review and consider Safety & Security Recommendations on the Facility Details page.
Fair
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page.
Poor
Flooring: Deep clean, repair or replace aged and damaged vinyl tile flooring. Replace aged and damaged carpet flooring.
Good
HVAC: All new HVAC units installed in July 2025.

Priority Projects

  • Metal (standing seam) roof system has hail damage that should be evaluated to determine if replacement is necessary; however, the system does reach life expectancy in 2030.
  • Cracking observed in framed partitions of the interior walls, repair walls, and refinish surface; observe for movement.
  • Replace aged and damaged carpet flooring.
  • Update lighting fixtures to LED.
  • Repair uneven pedestrian paved surfaces to reduce potential tripping hazards.
  • Test and balance new HVAC units when installed.

Additional Projects, if Funds Become Available

  • Refresh exterior door finished surfaces as needed.
  • Refresh finished wood door surfaces as needed.
  • Refresh high touched interior masonry wall finished surfaces.
  • Repair and refresh high touched interior wallboard wall finished surfaces.
  • Deep clean, repair or replace aged and damaged vinyl tile flooring.
  • Replace stained or damaged 2x2 lay-in ceiling tiles as needed.
  • Repair or replace fixed furnishings (cabinets or counter tops) as needed.
  • Update playground equipment as needed.
  • Add safety fall zone material as needed.

Actions to Improve the Educational Environment

The Little Buccaneers Daycare is a support facility to the district's educational goals.