Granbury ISD - Operations - Maintenance

  • Year Built
    1985
  • Square Footage
    7,800
  • Replacement Cost
    $5,171,806
  • Condition Budget
    $421,946
  • Facility Condition Index
    10%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface to reseal building envelope.
Good
Foundation: No issues observed or reported.
Good
Parking/Traffic: Slurry coat asphalt roadway and parking surfaces and restripe.
Good
Site: No issues observed or reported.
Fair
Doors: Refresh exterior hollow metal door finished surfaces as needed.
Fair
Exterior/Interior Windows: Update single pane window systems with energy efficient window systems.
Poor
Roof: The main building metal R-panel roof and skylights have reached the end of its useful life and should be scheduled for replacement. In the meantime, it's important to inspect the roof at least twice a year and after any major weather events to catch potential issues early. Additionally, the gutters and downspouts are in poor condition and should be replaced to ensure proper drainage and prevent further damage to the building. The 2005 shop building roof is in good condition and has approximately 10 years remaining life.

Interior

Good
Interior Structure: No issues observed or reported.
Good
Plumbing: No issues observed or reported.
Good
ADA: No issues observed or reported.
Good
Furnishing, Fixtures, Equipment: No issues observed or reported.
Fair
Electrical: Review and consider Safety & Security Recommendations on the Facility Details page.
Fair
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page.
Good
Flooring: No issues observed or reported.
Poor
HVAC: The Maintenance facility is currently operating with three HVAC units, two of which have already surpassed their expected service life. To maintain reliable performance and ensure continued energy efficiency, it would be advisable to schedule these units for replacement.

Priority Projects

  • The main building metal R-panel roof has reached the end of its useful life and should be scheduled for replacement. In the meantime, it's important to inspect the roof at least twice a year and after any major weather events to catch potential issues early. Additionally, the gutters and downspouts are in poor condition and should be replaced to ensure proper drainage and prevent further damage to the building.
  • Skylights on the main building should be replaced.
  • Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface to reseal building envelope.
  • Update single pane window systems with energy efficient window systems.

Additional Projects, if Funds Become Available

  • Refresh exterior hollow metal door finished surfaces as needed.
  • Slurry coat asphalt surfaces and restripe roadways.
  • Slurry coat asphalt surfaces and restripe parking spaces.

Actions to Improve the Educational Environment

This facility is a support facility for district.