Granbury ISD - Operations - Grounds
- Year Built1990
- Square Footage7,744
- Replacement Cost$5,134,675
- Condition Budget$680,049
- Facility Condition Index16%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Poor
Exterior Structure: Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface or replace wall panel to reseal building envelope.
Good
Foundation: No issues observed or reported.
Fair
Parking/Traffic: Install hard surface roadways to the facility. Install a hard surface parking area that includes ADA-compliant spaces and accessible routes to the facility. Once the surface is in place, stripe the parking lot appropriately to ensure clear organization and compliance with accessibility standards.
Fair
Site: Install exterior pole lighting to the facility.
Fair
Doors: Refresh exterior hollow metal door finished surfaces as needed.
Good
Exterior/Interior Windows: No issues observed or reported.
Poor
Roof: The metal R-panel roof has reached the end of its useful life and should be scheduled for replacement. In the meantime, it's important to inspect the roof at least twice a year and after any major weather events to catch potential issues early. Additionally, the gutters and downspouts are in poor condition and should be replaced to ensure proper drainage and prevent further damage to the building.
Interior
Good
Interior Structure: No issues observed or reported.
Fair
Plumbing: Replace toilet fixture in restroom.
Poor
ADA: Install compliant parking space and landings to enter the facility.
Good
Furnishing, Fixtures, Equipment: No issues observed or reported.
Poor
Electrical: Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates; funding for system inspections. Update lighting fixtures to LED. Review and consider Safety & Security Recommendations on the Facility Details page.
Fair
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page.
Good
Flooring: No issues observed or reported.
Priority Projects
- Metal (R) panel roof is past useful life expectancy and should be planned for replacement. Until replacement can occur, the roof should be inspected at least semi-annually and after every significant weather event. Additionally, the gutters and downspouts are in poor condition and should be replaced.
- Replace toilet fixture in restroom.
- Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates; funding for system inspections.
- Update lighting fixtures to LED.
- Install surveillance system.
- Install hard surface roadways to the facility.
- Install a hard surface parking area that includes ADA-compliant spaces and accessible routes to the facility. Once the surface is in place, stripe the parking lot appropriately to ensure clear organization and compliance with accessibility standards.
- Install exterior pole lighting to the facility.
Additional Projects, if Funds Become Available
- Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface or replace wall panel to reseal building envelope.
- Refresh exterior hollow metal door finished surfaces as needed.
Actions to Improve the Educational Environment
This facility is a support facility for district.