Granbury ISD - High School - Ag Complex

  • Year Built
    2008
  • Square Footage
    45,420
  • Replacement Cost
    $26,407,901
  • Condition Budget
    $695,088
  • Facility Condition Index
    3%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: No issues observed or reported.
Good
Foundation: No issues observed or reported.
Fair
Parking/Traffic: Repair damaged roadways and slurry coat asphalt surfaces. Install ADA compliant parking signage and restripe parking lot.
Fair
Site: Repair uneven pedestrian paved surfaces to reduce potential tripping hazards and re-caulk expansion joint areas as needed. Review and consider Safety & Security Recommendations on the Facility Details page.
Fair
Doors: Refresh interior and exterior hollow metal door surfaces as needed.
Good
Exterior/Interior Windows: No issues observed or reported.
Good
Roof: No issues reported or observed with the Metal Standing Seam roof system. Continue maintenance as per manufacturer's recommendations. Inspect roof at least twice annually and after every significant weather event.

Interior

Good
Interior Structure: No issues observed or reported.
Good
Plumbing: No issues observed or reported.
Fair
ADA: Update ADA parking signage.
Good
Furnishing, Fixtures, Equipment: No issues observed or reported.
Fair
Electrical: Update lighting fixtures to LED. Review and consider Safety & Security Recommendations on the Facility Details page.
Fair
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page.
Good
Flooring: No issues observed or reported.
Good
HVAC: No issues or concerns observed or reported with HVAC.

Priority Projects

  • Update lighting fixtures to LED.
  • Repair damaged roadways and slurry coat asphalt surfaces.
  • Install ADA compliant parking signage and restripe parking lot.
  • Repair uneven pedestrian paved surfaces to reduce potential tripping hazards and re-caulk expansion joint areas as needed.

Additional Projects, if Funds Become Available

  • Refresh exterior hollow metal door finished surfaces as needed.
  • Refresh interior hollow metal door surface as needed.

Actions to Improve the Educational Environment

The Ag Complex is in good condition and appear to satisfy the program needs.