Granbury ISD - Elementary - Emma Roberson Gym 2016

  • Year Built
    2016
  • Square Footage
    4,953
  • Replacement Cost
    $3,856,811
  • Condition Budget
    $56,503
  • Facility Condition Index
    2%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: Exterior structure appeared to be in good condition.
Good
Foundation: Foundation appeared to be in good condition.
Good
Site: Facility site appears to be in good condition.
Good
Doors: Interior and exterior doors appeared to be in good condition.
Good
Exterior/Interior Windows: Exterior windows appeared to be in good condition.
Good
Roof: The roof overall is in good condition. Minor damage appeared evident. As the roof approaches end of life expectancy the roof should be planned for replacement. Until replacement occurs, the roof should be inspected at least semi-annually and after every significant weather event.

Interior

Good
Interior Structure: Interior structure appeared to be in good condition.
Good
Plumbing: Plumbing systems appeared to be in good condition.
Good
ADA: No issues with ADA accessibility were observed. The facility appears to be in compliance with ADA requirements.
Good
Furnishing, Fixtures, Equipment: Furnishings, Fixtures, and Equipment all appeared to be in good condition.
Good
Electrical: The interior electrical systems appeared to be in good condition. Updating interior lighting systems to LED fixtures is recommended.
Good
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Flooring appeared to be in good condition.
Good
HVAC: No issues or concerns with the HVAC systems in the Emma Roberson Elementary Gym.

Priority Projects

  • Fill in holes around foundation.

Additional Projects, if Funds Become Available

  • Update interior lighting fixtures to LED.

Utilization

0% Capacity: Low Utilized

Capacity

Pupil Count

Student Enrollment

Functional Capacity

Facility Condition Index

FCI: 2%

Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Occupant Flow: Occupant flow within the facility appears adequate.
Good
Security: See Safety & Security recommendations on the Facility Details page.
Good
Physical Education: Physical Education space appears adequate for students.

Actions to Improve the Educational Environment

The educational environment of the facility appears to be in good condition. Updating the interior lighting to LED fixtures is recommended.