• Year Built
    1972
  • Square Footage
    2,436
  • Replacement Cost
    $1,416,329
  • Condition Budget
    $647,032
  • Facility Condition Index
    55%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Replace damaged decorative metal perimeter panels, sealants and fasteners and paint. Clean and repaint exterior CMU blocks; replace any deteriorated mortar at the time of refinishing. Replace all building seam calking.
Good
Foundation: No issues observed.
Good
Parking/Traffic: Information included with the HS Dashboard information.
Good
Site: Add additional perimeter lighting adjacent to entry points.
Good
Doors: Paint exterior metal doors and replace deteriorated weather stripping and door hardware.
Good
Roof: Installed in 2020 the single ply roof system is in overall good condition. Manufacturer-recommended maintenance should be implemented.

Interior

Good
Interior Structure: Paint interior CMU walls where finish had deteriorated. Replace damaged and stained ceiling tiles.
Good
Plumbing: No issues observed. Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Good
ADA: No issues observed.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Good
Electrical: Update lighting to LED units. Electrical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Poor
Safety/Security: Install sprinkler system in all student-occupied areas. Systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Good
Flooring: No issues observed.
Good
HVAC: HVAC units are in good condition and less than 5 years of age. Preventative maintenance should be implemented.

Priority Projects

  • Clean and repaint exterior CMU blocks; replace any deteriorated mortar at the time of refinishing. Replace all building seam calking.

Additional Projects, if Funds Become Available

  • Metal panels on perimeter are original to the facility and should have repairs and replacements completed to ensure further deterioration.
  • Replace damaged decorative metal perimeter panels, sealants and fasteners and paint.
  • Paint exterior metal doors and replace deteriorated weather stripping and door hardware.
  • Paint interior CMU where finish had deteriorated.
  • Replace damaged and stained ceiling tiles.

Actions to Improve the Educational Environment

No applicable at this facility.