• Year Built
    1982,2013,2016
  • Square Footage
    21,000
  • Replacement Cost
    $13,924,092
  • Condition Budget
    $14,913,330
  • Facility Condition Index
    131%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Replace damaged and deteriorated exterior metal panels, sealants and fasteners. Paint the exterior of the wood shop and classroom building. Enclose the remaining sides of the Ag barn where animals are stored to secure interior spaces.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Information with district-wide information on HS Dashboard.
Fair
Site: Install additional pole lighting in the northside parking lot. Replace existing exterior building lighting with LED units and add additional units adjacent to entry points. Replace damaged sections of fencing and privacy inserts. Install metal canopy to cover exterior shop spaces.
Good
Doors: Replace interior doors and hardware as needed for ADA compliance and refresh finish surfaces. Paint exterior metal doors at the classroom and woodshop buildings. Replace any damaged weather stripping and hardware. Replace deteriorated and damaged metal panels and hardware on overhead garage doors at the wood shop. Add overhead garage door to Ag barn after enclosed.
Poor
Exterior/Interior Windows: Replace window units in the wood shop.
Good
Roof: Roof systems are in overall good to fair condition, but manufacturer-recommended maintenance should be implemented. Metal roof over the classrooms and wood shop is original to the facility (1982) and has reached the end of its useful life cycle. It was coated in 2022 to prolong life, but district will need to consider replacement in the next 5-10 years. Gutters and downspouts on the classroom building are in overall poor condition and they should be replaced.

Interior

Fair
Interior Structure: Paint interior metal wall panels where finish deteriorated. Repair damaged sections of CMU wall surfaces and paint. Replace damaged, stained and sagging ceiling tiles and sections of grid in classroom spaces. Replace deteriorated insulation in wood shop area.
Good
Plumbing: Replace damaged and deteriorated plumbing fixtures and drinking fountains. Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates
Poor
ADA: No ADA compliant parking, pathways or entry points to the Ag barn.
Good
Furnishing, Fixtures, Equipment: Repair or replace aged or damaged lockers, cabinets, and countertops as needed. Replace damaged moveable furnishings as needed.
Good
Electrical: Update lighting systems to LED units and install lighting control system. Update to fiber cabling and devices to support secure Wi-Fi as needed. Electrical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Poor
Safety/Security: Install sprinkler system in all student occupied areas. Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Good
Flooring: Clean, repair cracks and reseal concrete flooring in shop areas. Replace damaged and stained vinyl floor tiles.
Good
HVAC: HVAC units are in good condition and less than 5 years of age. Ensure that preventative maintenance is performed and that drainage systems are moving water away from the units to prevent ponding adjacent to the units.

Priority Projects

  • Replace damaged and deteriorated exterior metal panels, sealants and fasteners. Paint the exterior of the wood shop and classroom building. Enclose the remaining sides of the Ag barn where animals are stored to secure interior spaces.
  • Insulation Replacement

Additional Projects, if Funds Become Available

  • Metal roof over the classrooms and wood shop is original to the facility and has reached the end of its useful life cycle. It was coated in 2022 to prolong life but district will need to consider replacement in the next 5-10 years. Pricing for roof replacement.
  • Replace window units in the wood shop.
  • Paint exterior metal doors at the classroom and woodshop buildings. Replace any damaged weather striping and hardware.
  • Replace deteriorated and damaged metal panels and hardware on overhead garage doors at the wood shop. Add overhead garage door to Ag barn after enclosed.
  • Replace interior doors and hardware as needed for ADA compliance and refresh finish surfaces.
  • Paint interior metal doors and replace damaged hardware.
  • Repair damaged sections of CMU wall surfaces and paint.
  • Paint interior metal wall panels where finish deteriorated.
  • Replace damaged and stained vinyl floor tiles.
  • Clean, repair cracks and reseal concrete flooring in shop areas.
  • Replace damaged, stained and sagging ceiling tiles and sections of grid.
  • Paint open structure components.
  • Replace damaged and deteriorated plumbing fixtures and drinking fountains.
  • Update lighting systems to LED units.
  • Update to fiber cabling and devices to support secure Wi-Fi as needed.
  • Install lighting control system.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Replace damaged sections of fencing and privacy inserts.
  • Install metal canopy to cover exterior shop spaces.
  • Install additional pole lighting in the northside parking lot.
  • Replace Gutters and downspouts
  • Classroom and office addition
  • AG barn expansion.
  • CTE Classroom addition.
  • Central Office
  • Floral Fridge
  • Paint Boot Relocation
  • Livestock Equipment Storage
  • Shop Material Storage
  • Student Restrooms with Lockers
  • Welding Booth Addition
  • CNC Office

Utilization

0% Capacity: Low Utilized

Capacity

Pupil Count

Student Enrollment

Functional Capacity

Facility Condition Index

FCI: 131%

Actions to Improve the Educational Environment

The educational environment of the shops and classrooms appear to satisfy the program needs overall, although facility needs updates. Additional classroom, storage and office space are needed to accommodate all the programs offered and technology updates should be further evaluated to ensure they meet the program requirements.