• Year Built
    2001
  • Square Footage
    10,168
  • Replacement Cost
    $5,911,835
  • Condition Budget
    $3,636,041
  • Facility Condition Index
    74%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Replace sections of exterior metal panels where patched. Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed. Refresh finish surface.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Information found on the HS Dashboard.
Good
Site: Add additional perimeter lighting to the sides of the facility.
Good
Doors: Replace damaged interior doors and hardware as needed for ADA compliance. Refresh finish surfaces and door frames., Refresh exterior door finished surfaces as needed and replace weatherstripping and door sweeps.
Fair
Roof: Metal roof system is reaching the end of its life-cycle and interior areas are showing signs of roof leaks. Manufacture-recommended maintenance should be implemented and further evaluation should be completed to determine ways to extend the life span.

Interior

Fair
Interior Structure: Repair damaged wallboard and texture and paint interior surfaces. Replace stained, sagging and damaged ceiling tiles and sections of grid system. Recommend replacing 2x4' system ceiling tiles with a 2x2' system.
Good
Plumbing: Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed. Recalk around sinks
Good
ADA: No issues observed.
Good
Furnishing, Fixtures, Equipment: Install vent system over cooking ranges in culinary arts room. Replace damaged moveable furnishings as needed.
Good
Electrical: Update lighting systems to LED and install lighting control system.
Poor
Safety/Security: Install sprinkler system in all student occupied areas.
Fair
Flooring: Replace damaged and deteriorated vinyl floor tiles. Deep clean, repair or replace aged and damaged soft surface flooring.
Fair
HVAC: HVAC units are in fair condition but 3 out of 8 units (25% of cooling capacity) are nearing the end of their useful life cycle. Update duct work, web-based energy management system, test, and balance new HVAC units when installed where needed. Update electrical service if needed to support additional load from new HVAC system and classroom use.

Priority Projects

  • Metal roof system is reaching the end of its life-cycle and interior areas are showing signs of roof leaks. Manufacture-recommended maintenance should be implemented and further evaluation should be completed to determine ways to extend the life span.
  • Install vent system over cooking ranges in culinary arts room.

Additional Projects, if Funds Become Available

  • Replace sections of exterior metal panels where patched. Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed. Refresh finish surface.
  • Refresh exterior door finished surfaces as needed and replace weatherstripping and door sweeps.
  • Replace damaged interior doors and hardware as needed for ADA compliance. Refresh finish surfaces and door frames.
  • Repair damaged wallboard and texture and paint interior wall surfaces.
  • Deep clean, repair or replace aged and damaged soft surface flooring.
  • Replace damaged and deteriorated vinyl floor tiles.
  • Repair damaged wallboard and texture and paint interior ceiling surfaces.
  • Replace stained, sagging and damaged ceiling tiles and sections of grid system.
  • Replace stained, sagging and damaged ceiling tiles and sections of grid system. Recommend replacing ceiling tiles with a 2x2' system.
  • Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed. Recalk around sinks.
  • Update lighting systems to LED.
  • Install lighting control system.
  • Replace damaged moveable furnishings as needed.
  • CTE Lab Renovation
  • Culinary refrigeration unit.
  • Technology Storage

Utilization

0% Capacity: Low Utilized

Capacity

Pupil Count

Student Enrollment

Functional Capacity

Facility Condition Index

FCI: 74%

Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Core Classrooms: Classrooms are in overall fair condition, but adjustments should be made to spaces for the specialty programs being offered in this facility.
Good
Occupant Flow: Appropriately sized halls that allow for good pedestrian traffic flow within the building.
Good
Security: See Safety & Security recommendations on the Facility Details page.

Actions to Improve the Educational Environment

Classrooms are in overall fair condition, but adjustments should be made to spaces for the specialty programs being offered in this facility.