• Year Built
    1990
  • Square Footage
    5,300
  • Replacement Cost
    $3,514,176
  • Condition Budget
    $5,874,701
  • Facility Condition Index
    202%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Replace damaged and rusted exterior metal panels. Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed.
Good
Foundation: No issues observed.
Poor
Parking/Traffic: Pave bus parking lot, restripe, add appropriate ADA Van spaces and ADA signage. Pricing included on the HS Dashboard.
Fair
Site: Add additional pole lighting in the bus parking lot.
Fair
Doors: Replace non-ADA compliant door hardware and refresh finishes. Replace non-ADA compliant door hardware and refresh finishes. Replace damaged garage door panels, hardware and frame.
Good
Exterior/Interior Windows: No issues observed.
Poor
Roof: The metal roof system was installed in 1990 and has aged past its useful life cycle and the district should consider replacing it.

Interior

Good
Interior Structure: Replace stained, sagging and damaged ceiling tiles and grid system.
Good
Plumbing: Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed. Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Good
ADA: Not issues observed.
Fair
Furnishing, Fixtures, Equipment: Repair or replace aged or damaged lockers, cabinets, and countertops as needed. Replace damaged moveable furnishings as needed.
Good
Electrical: Update lighting to LED. Install access control system. Electrical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Fair
Safety/Security: Install sprinkler system. Electrical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Good
Flooring: Clean and reseal concrete flooring in shop area. Replace flooring in restrooms where damaged or deteriorated.
Fair
HVAC: The single HVAC unit at the maintenance building has aged past its useful life cycle and the district should consider replacement. Update Energy Management system as needed when new HVAC units are installed.

Priority Projects

  • The metal roof system was installed in 1990 and has aged past its useful life cycle and the district should consider replacing it.
  • Replace damaged and rusted exterior metal panels. Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed.
  • Add additional pole lighting in the bus parking lot.
  • Replace Gutters and downspouts.

Additional Projects, if Funds Become Available

  • Replace damaged garage door panels, hardware and frame.
  • Replace non-ADA compliant door hardware and refresh finishes.
  • Replace non-ADA compliant door hardware and refresh finishes.
  • Replace flooring in restrooms where damaged or deteriorated.
  • Clean and reseal concrete flooring in shop area.
  • Replace stained, sagging and damaged ceiling tiles and grid system.
  • Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed.
  • Install sprinkler system.
  • Update lighting to LED.
  • Install access control system.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Install covered bus parking
  • Maintenance Shop addition
  • Central District Storage
  • Drainage Inlet/Outlet repair
  • District Drainage Grading

Actions to Improve the Educational Environment

Not Applicable at this facility.