Frankston ISD - Athletics and Concessions
- Year Built1972
- Square Footage5,124
- Replacement Cost$1,726,632
- Condition Budget$26,296,501
- Facility Condition Index1855%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: Replace building seam calking. Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface or replace wall panel to reseal building envelope.
Good
Foundation: Repair damaged section of foundation in field house.
Fair
Parking/Traffic: Pave roadway between fields and the storage building.
Fair
Site: Insall additional lighting adjacent to the field house and concessions building. Install irrigation system on the competition football field.
Good
Doors: Replace damaged and deteriorated metal doors, frames and hardware. Replace door hardware for ADA accessibility using a district master restricted keyway system. Refresh surface finishes.
Good
Exterior/Interior Windows: No issues observed.
Good
Roof: Roof systems for the athletic facilities are in overall fair to poor condition but manufacturer-recommended maintenance should be implemented to ensure the systems integrity. The metal roof system on the storage facility adjacent to the football field (Old Weight Room) is original to the building (1995) and has reached the end of its useful life cycle. District should consider replacement in the next 1-3 years. All missing and damaged metal roof fasteners and sealants should be replaced, and any damaged panels should be further evaluated for repair or replacement options.
Interior
Good
Interior Structure: Replace damaged metal panels and refresh finished surfaces. Repair and repaint interior CMU surfacing. Repair damaged wallboard and surfacing and paint. Paint visible interior structure where finish deteriorated.
Fair
Plumbing: Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed. Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Poor
ADA: Pathways to visitor seating at the football stadium are not all accessible. Field house is not accessible.
Fair
Furnishing, Fixtures, Equipment: Replace damaged and deteriorated shelving and built-in lockers. Replace damaged and deteriorated moveable furniture and lockers.
Fair
Electrical: Update lighting to LED and install a lighting control system in the Field House. Install access control on the Field House. Incorporate the Field House facility into central data and communication system. Electrical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Fair
Safety/Security: Install sprinkler system in the Field House.
Good
Flooring: Repair cracking in concrete flooring, clean and seal in restrooms and field house.
Good
HVAC: HVAC units are present at the Field House and in the Press Box and each unit is nearing the end of its useful life cycle. While no issues were observed, due to the age, the district should consider replacement in the next 1-5 years. At the time of replacement controls should be evaluated in the Field House for necessary replacements and updates.
Priority Projects
Additional Projects, if Funds Become Available
- Roof system on the storage facility adjacent to the football field (Old Weight Room) is original to the building (1995) and has reached the end of its useful life cycle. District should consider replacement in the next 1-3 years. Replace all missing and damaged metal roof fasteners and sealants. Recommend manufacturer-recommended maintenance be implemented.
- Repair damaged in foundation in Field House.
- Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface or replace wall panel to reseal building envelope.
- Replace building seam calking.
- Replace door hardware for ADA accessibility using a district master restricted keyway system, and refresh finish surfaces.
- Replace damaged metal door panels and hardware and refresh exterior finishes as needed.
- Replace damaged and deteriorated interior metal doors, frames and hardware. Refresh surface finishes.
- Repair and repaint interior CMU surfacing.
- Repair damaged wallboard and surfacing and paint.
- Replace damaged metal panels and refresh finished surfaces.
- Repair cracking in concrete flooring, clean and seal in restrooms and field house.
- Repair damaged wallboard finish and paint.
- Paint interior ceiling structure where finish deteriorated.
- Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed.
- Update lighting to LED.
- Incorporate the Field House facility into central data and communication system.
- Install access control on the Field House.
- Install a lighting control system in the Field House.
- Replace damaged and deteriorated shelving and built-in lockers.
- Replace damaged and deteriorated moveable furniture and lockers.
- Pave roadway between fields and the storage building.
- Install irrigation system on the competition football field.
- Insall additional lighting.
- Replace bleachers at the football field on visitor side. Funding for further erosion control measures included with HS Dashboard.
- Recrown, replace grass, replace curb and install irrigation on football field.
- Replace lighting at football field. Add additional lighting adjacent to the practice field.
- Replace football scoreboard.
- Grade field for erosion and replace grass turf.
- Grade field for erosion and replace grass turf.
- Add bleacher seating adjacent to tennis courts.
- Replace curb system along track.
- Apply a structural topcoat to track system.
- Practice field storage
- Artificial Turf Football Field
- Baseball Press Box
- Softball Press Box.
- Artificial Softball Turf
- Artificial Baseball Turf
- Covered practice area
Actions to Improve the Educational Environment