• Year Built
    1993
  • Square Footage
    11,200
  • Replacement Cost
    $5,620,353
  • Condition Budget
    $550,172
  • Facility Condition Index
    12%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed.
Poor
Foundation: Re-seal minor slab cracking indicating movement, observe repairs for additional movement.
Fair
Parking/Traffic: Remove alligatoring asphalt surface, replace asphalt surfacing, seal area, and restripe as needed
Good
Site: No issues observed.
Fair
Doors: Replace weatherstripping and door sweeps on exterior doors as needed and refresh exterior panels. Repair oxidation damage on garage doors, repair or replace as needed. Repair or refresh interior door finished surfaces.
Good
Exterior/Interior Windows: No issues observed.
Good
Roof: Roof assessment was made based on visual from the ground and interior of the building. Roof appears to be in good condition. Documents show the metal roof was installed in 2005, indicating it as 18 years at the time of assessment. This type of roofing system has a typical life expectancy of 40-50 yrs. Due to age and no evidence of interior leaking, the roof system is estimated to be in good repair. Basic preventative maintenance is recommended. In addition, the district has experienced a recent hail event and it is recommended to have facility inspected by a licensed roofing contractor to determine is repairs are needed.

Interior

Fair
Interior Structure: Refresh high touched interior wall finished surfaces.
Good
ADA: ADA accessibility is adequate for this type of facility.
Good
Furnishing, Fixtures, Equipment: No issues observed. No issues observed.
Fair
Electrical: Electrical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Poor
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page (perpetual).
Good
Flooring: No issues observed.
Poor
HVAC: Plan for replacement of HVAC units that will be at or past their useful life expectancy in 2024. Test and balance new HVAC units when installed.

Priority Projects

  • Reseal cracks in foundation and observe for further movement.
  • Plan for proactive replacement of aged HVAC systems that have exceeded useful life expectancy.
  • Inspect, repair or replace mechanical, electrical and plumbing infrastructure that is over 30 yrs.
  • of age.
  • Review safety & security Recommendations and implement security improvements.

Additional Projects, if Funds Become Available

  • Repair and reseal all metal panels in exterior building envelope.
  • Repair and repaint high-touch interior sheetrock walls as needed.
  • Inspect and reseal roof structure to help maintain life expectancy.
  • Install hard surface, asphalt roadway and parking areas around facility.
  • Replace weather stripping and sweeps on all exterior doors and refinish metal panels as needed.

Actions to Improve the Educational Environment

This building is a support building and is not used as an educational facility.