Seagraves ISD - Junior High-Main
- Year Built1959
- Square Footage53,005
- Replacement Cost$33,569,545
- Condition Budget$18,312,607
- Facility Condition Index66%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Re-seal the building envelope by regrouting or repointing the masonry work, filling holes, replacing cracking or missing caulking around penetrations, and replacing cracking or missing expansion joint caulking as needed.
Fair
Foundation: Foundation movement indicated by cracks in interior CMU & exterior brick masonry at various locations throughout, as well as floor cracks in auditorium wing, engineer study performed, indicated that cracks were due to normal settling
Fair
Parking/Traffic: Repair damaged roadways, slurry coat asphalt surfaces, re-striping all parking, and stripe bus lanes and pick up lanes.
Fair
Site: Remove & replace damaged concrete walkways, steps and landings Install additional exterior and parking lot lighting.
Fair
Doors: Replace exterior door hardware for ADA accessibility using a district master restricted keyway system, and refresh finish surfaces. Replace weatherstripping and door sweeps on exterior doors as needed. Replace interior doors and hardware as needed for ADA compliance, update to district master restricted keyway system and interior locking capability, and refresh finish surfaces.
Fair
Exterior/Interior Windows: Replace old leaking window system with energy efficient window systems and replace/repair water damage areas around windows. Refresh finished painted surfaces as needed.
Poor
Roof: Roof has evidence of hail damage. Visible signs of aging are significant. Possible hail damage is visible on the flashing, parapet walls and HVAC units. Based on evidence of water damage within the building on the roof deck above the ceiling grid and on ceiling tiles and walls, the roof system may have failed and may require replacement. In addition, the roof has exceeded its life expectancy of 20 years. Per district, roof is slated for replacement at end of year 2024.
Interior
Fair
Interior Structure: Repair and re-seal cracks in floor and construction joints after mitigation is completed for foundation, observe for movement. Repair cracking and gaps in wall structure; observe for movement. Seal or repair all cracking and gapping masonry walls, refresh finished surfaces. Repair damage to sheetrock, fill holes and refresh finished surface. Repair wood paneling, resecure to walls where loose, refresh or refinish blemished surface. Clean, repair or replace aged and damaged ceilings and refresh finished surfaces. Replace damaged and stained ceiling tiles as needed. Clean and refresh open structure ceiling finished surfaces.
Fair
Plumbing: Plumbing fixtures caulk around base, replace urinals and fountains as needed and inspect aging plumbing infrastructure.
Poor
ADA: Accessibility is limited within the building. Classroom doors cannot be opened. Certain areas of the building could prove difficult to use, especially in an emergency situation. One restroom has been made accessible for special needs students.
Fair
Furnishing, Fixtures, Equipment: No cafeteria is available at this campus. Update science lab stations and equipment. Renovate dressing rooms at stage. Remove graffiti from backs of auditorium chairs. Update restroom accessories, stalls and showers for ADA compliance as needed. Repair or replace aged or damaged lockers, cabinets, and countertops as needed. Replace damaged moveable furnishings as needed.
Fair
Electrical: Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Update service and switch gear as needed to support load. Install additional receptacles in classrooms. Install additional site lighting.
Update service and switch gear as needed to support load. Install lighting control system.
Poor
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page (perpetual).
Fair
Flooring: Deep clean, repair or replace aged and damaged soft surface flooring, resilient flooring and ceramic tile. Repair and re-seal cracks in concrete floor, repair or replace finish surfacing, observe for movement.
Poor
HVAC: Repair, replace or re-locate plumbing wastewater & supply lines for ADA-compliant fixtures. Replace inoperable fixtures. Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Replace domestic water heating units past their useful life expectancy. HVAC system components at or past their useful life expectancy should be replaced. Update ductwork as needed when HVAC units are replaced. Test and balance new HVAC units when installed.
Priority Projects
- Roof shows significant signs of aging, hail & water damage. Roof slated for replacement at end of year 2024.
- Repair and reseal cracks in floor, construction joints, and wall structure after mitigation of foundation.
- Plan for proactive replacement of HVAC systems that have exceeded useful life expectancy.
- Inspect, repair or replace mechanical, electrical and plumbing infrastructure over 30 years of age.
- Repair or replace roof structure due to aging and possible hail damage.
- Perform ADA accessibility upgrades needed to bring building into compliance.
- Review Safety & Security Recommendations and implement security improvements.
Additional Projects, if Funds Become Available
- Remove outside door hardware (handles) from all doors except designated points of entry.
- Add interior and exterior directional signage, ADA compliant parking signage and ADA compliant room signage.
- Install perimeter fencing to restrict public access to and around facility.
- Install canopies for loading & unloading of students & repair canopies to adjoining buildings.
- Install a nurse's office.
- Recommend addition of cafeteria ($450/sf), or enclosed connector between campuses ($250/sf).
- Add bullet resistant film to 6 storefront doors and exterior windows.
- Renovate locker rooms at gym.
- Repair masonry damage, reseal and regrout exterior building envelope.
- Repair or replace damaged interior walls and repaint or refinish walls as needed.
- Replace all stained or missing ceiling tiles.
- Clean and refresh damaged sheetrock ceiling areas.
- Repair, resurface and restripe all roadways and parking areas surrounding the building.
- Update science lab stations & equipment, renovate stage dressing areas, and repair or replace all damaged built-in and moveable furnishings.
- Remove and replace all damaged concrete walkways, steps and landings around building.
- Install additional parking lot lighting.
- Install lighting control system to improve energy efficiency.
- Replace weather stripping and sweeps on all exterior doors and refinish metal door panels.
- Replace old, leaking windows with energy efficient window systems.
- Deep clean, repair or replace damaged soft surface, resilient tile and ceramic tile flooring.
Utilization
42% Capacity: Low Utilized
Capacity
Pupil Count
Student Enrollment
152
Functional Capacity
360
Facility Condition Index
FCI: 66%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Fair
Core Classrooms: Most classrooms are smaller than recognized standard (700sf for 2nd-12th.)
Poor
Visual and Performing Arts: Band area appears to be undersized for the students in attendance, it lacks adequate storage and practice areas. Stage is adequate but dressing rooms are in poor condition.
Poor
Cafeteria: No cafeteria at this campus. Recommend construction of a cafeteria specific to this school, or construction of enclosed walkway to HS cafeteria.
Good
Occupant Flow: Pedestrian traffic flow within the building is good.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Good
Special Education: Rooms are generally in good condition and seem to satisfy the basic special education program needs.
Good
Physical Education: Gym is generally in good condition and satisfies the basic physical education program needs. However, locker rooms need updating.
Fair
Library: Library is just undersized to adequately serve this campus when campus is at full functional capacity.
Fair
Administration: Campus offices are not located adjacent to buildings main entrance, internally they are in good condition but a bit small.
Actions to Improve the Educational Environment
The educational environment of the facility is in fair condition. The classrooms & library are undersized by TEA standards. In addition, Maintenance repairs are needed to reseal the building envelope, refresh finished surfaces, and update mechanical systems. Security enhancements to facility should be made, and Improved ADA accessibility compliance to offer an equal educational opportunity to all.