Seagraves ISD - Junior High-Computer/IT

  • Year Built
    1981
  • Square Footage
    1,800
  • Replacement Cost
    $1,046,548
  • Condition Budget
    $605,712
  • Facility Condition Index
    67%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Poor
Exterior Structure: Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, also repair or replace damaged wall panels as needed to prevent water and pest intrusion.
Good
Foundation: No issues observed.
Good
Site: No issues observed.
Fair
Doors: Replace weatherstripping and door sweeps on exterior doors as needed. Update door hardware using a district master restricted keyway system, and refresh finish surfaces. Update interior & exterior door hardware to ADA compliant hardware as needed. Refresh finished door surface as needed. Replace missing door jamb at interior of entrance door.
Good
Exterior/Interior Windows: No issues observed.
Fair
Roof: Roof shows signs of potential hail damage. Water-stained and missing ceiling tiles indicate that the roof system is leaking and in need of repairs. At more than forty years old, the metal roof has reached its expected useful life. Recommend inspection by a licensed roofing contractor to determine extent of needed repair or replacement.

Interior

Fair
Interior Structure: Repair wall surface and refresh finished surfaces as needed. Replace damaged, stained or missing ceiling tiles as needed.
Poor
ADA: Updating of door hardware, restroom facilities, and signage is needed for ADA compliance.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Fair
Electrical: Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Install lighting control system.
Poor
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page (perpetual).
Fair
Flooring: Deep clean, repair or replace aged and damaged soft surface flooring and resilient flooring.
Poor
HVAC: Replace HVAC units at or past their useful life expectancy. Update ductwork as needed and provide testing & Balancing when HVAC units are replaced.

Priority Projects

  • Repair or replaced damaged metal wall panels and reseal building envelope.
  • Proactively replace aged HVAC systems that have exceeded useful life expectancy.
  • Inspect and repair or replace mechanical, electrical and plumbing infrastructure over 30 years of age.
  • Repair or replace roof as needed due to aging and possible hail damage.
  • Perform ADA accessibility improvements to bring building into compliance.
  • Review safety & security recommendations and implement security improvements.

Additional Projects, if Funds Become Available

  • Remodel restrooms and hallway for ADA compliance.
  • Provide Halon fire control system for Network Operating Center.
  • Repair sheetrock walls and repaint high touch areas.
  • Replace stained or missing ceiling tiles.
  • Install lighting control system to improve energy efficiency.
  • Replace weatherstripping and sweeps on exterior doors & refinish metal door panels.
  • Replace missing interior door jamb at entrance door.
  • Deep clean, repair or replace soft surface flooring and resilient tile.

Actions to Improve the Educational Environment

Non-Student area. Not applicable