Seagraves ISD - Seagraves Elementary
- Year Built2014
- Square Footage66,189
- Replacement Cost$37,223,456
- Condition Budget$1,166,624
- Facility Condition Index4%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: No issues observed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Slurry coat asphalt surfaces, re-striping all parking, and stripe bus lanes and pick up lanes.
Good
Site: No issues observed.
Good
Doors: No issues observed.
Good
Exterior/Interior Windows: No issues observed.
Fair
Roof: Roof Assessment Summary shows some signs of aging, as well as some areas of minor pooling and bubbling, some indentions from possible hail damage but no signs of interior leaks were observed. District has indicted that roofs will be replaced at end of year 2024
Interior
Fair
Interior Structure: Minor cracking in various locations throughout the building. Seal slab cracking and observe for movement. If movement persists, consider engineering study to determine cause and proper mitigation. Refresh high touched interior CMU and sheetrock wall finished surfaces.
Good
Plumbing: N/A
Good
ADA: ADA accessibility is good at this campus and facility is mostly compliant.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Good
Electrical: No issues observed.
Poor
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page (perpetual).
Fair
Flooring: Deep clean, repair or replace aged and damaged soft surface flooring, resilient flooring, and ceramic tile flooring. Reseal surface of polished concrete flooring. Repair or replace damaged liquid applied flooring where chipped and cracked.
Poor
HVAC: Mini-split units need coil replacement Mini-split units need coil replacement.
Priority Projects
- Review Safety & security recommendations and implement security improvements.
- Replace coils on all mini-split HVAC units.
- Repair or reseal cracks in concrete subfloor and repair or replace flooring as needed.
- Inspect and repair minor roof bubbling and pooling as needed.
Additional Projects, if Funds Become Available
- Install open door alarms on external doors.
- Install impact resistant film on all external glass, storefront doors, entrance windows & locking vestibule.
- Resurface and restripe parking lots.
- Deep clean and repair soft surface, resilient tile and ceramic floors as needed.
Utilization
43% Capacity: Low Utilized
Capacity
Pupil Count
Student Enrollment
194
Functional Capacity
455
Facility Condition Index
FCI: 4%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Core Classrooms: Classrooms are in good condition and adequately sized.
Good
Visual and Performing Arts: Music room is generally in good condition and satisfies basic music program needs.
Good
Cafeteria: Cafeteria seating & kitchen are adequately sized to serve campus when campus is at or near full functional capacity.
Good
Occupant Flow: Pedestrian traffic flow within the building is good.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Good
Site Playgrounds/Extra Curricular: Playgrounds & fall material are in good condition and have ADA complaint access.
Good
Special Education: Rooms are generally in good condition and seem to satisfy the basic special education program needs.
Good
Library: Library is adequately sized to serve this campus when at or near full functional capacity.
Good
Administration: Office area in good condition and meets the needs of the campus.
Actions to Improve the Educational Environment
District should review and consider Safety & Security Recommendations on the Facility Details page (perpetual).