Seagraves ISD - High School-Field House

  • Year Built
    1992
  • Square Footage
    7,961
  • Replacement Cost
    $5,496,523
  • Condition Budget
    $791,758
  • Facility Condition Index
    17%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Inspect exterior expansion caulking and repair as needed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Repair parking, slurry coat asphalt surfaces, re-striping all parking, and provide ADA compliant signage.
Good
Site: No issues observed.
Fair
Doors: Replace weatherstripping and door sweeps on exterior doors as needed. Replace weatherstripping and door sweeps on exterior doors as needed. Repair interior doors, hardware, and finish surfaces as needed. Replace door jamb on laundry room. Refinish interior doors as necessary.
Fair
Exterior/Interior Windows: Re-caulk window frames as needed.
Fair
Roof: Roof has evidence of hail damage although visible damage to surface appears minimal. There does not appear to be interior leaks. Due to potential storm damage, an inspection of all materials of the roof system should be conducted by a licensed roofing contractor to ensure needed repairs are identified and completed.

Interior

Fair
Interior Structure: Minor cracking observed. Repair or seal minor cracking and observe for further movement. Refresh high touched interior wall finished surfaces. Repair areas of shower enclosure. Patch and paint hole in laundry room ceiling. Minor holes in insulation material of painted structure.
Poor
ADA: ADA accessibility is fairly good at this facility. The main issue is a lack of designated parking. District should consider making at least 1 space as ADA/Van accessible and hash off entrance space.
Fair
Furnishing, Fixtures, Equipment: Repair or replace aged or damaged lockers, cabinets, and countertops as needed. Replace damaged moveable furnishings as needed.
Fair
Electrical: Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Per survey, no wireless or desktop connectivity is available in this building. Update network cabling, servers, switches, and routers as needed.
Poor
Safety/Security: Review and consider Safety & Security Recommendations on the Facility Details page (perpetual).
Fair
Flooring: Deep clean, replace aged and damaged soft surface flooring in coaches office. Deep clean, reseal surface cracks, and refresh finished floor surface.
Poor
HVAC: Plan for replacement of HVAC units that are past their useful life expectancy. Update ductwork as needed when HVAC units are replaced. Test and balance new HVAC units when installed.

Priority Projects

  • Plan for proactive replacement of HVAC units that have exceeded useful life expectancy.
  • Perform all necessary ADA upgrades to bring building into compliance.
  • Review Safety & Security recommendations and perform security improvements.

Additional Projects, if Funds Become Available

  • Replace signage over front door & install ADA parking signage.
  • Replace or repair, sand & paint benches at locker room door.
  • Re-seal the CMU at entrance walls at the locker room by regrouting or repointing the masonry work.
  • Restrict public access to and around site. Provide exterior secured area complying with Chapter 61.1031.
  • Inspect and replace expansion caulking on exterior walls.
  • Repair minor cracking in slab and observe for further movement.
  • Repair and repaint all interior walls and ceilings where needed.
  • Resurface and restripe parking area.
  • Repair or replace damaged lockers, cabinets, and furniture as needed.
  • Have mechanical, electrical and plumbing infrastructure over 30 yrs.
  • Replace weatherstripping and repair interior and exterior doors as needed.
  • Recaulk window frames.
  • Deep clean, repair or replace carpeting and painted hard surface flooring.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Poor
Security: Review and consider Safety & Security Recommendations on the Facility Details page (perpetual).

Actions to Improve the Educational Environment

With upgrades to Safety & Security, and ADA upgrades, the Field House facility support will the educational goals of the district.