• Year Built
    2004
  • Square Footage
    1,681
  • Replacement Cost
    $951,480
  • Condition Budget
    $82,437
  • Facility Condition Index
    10%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed. Brush rust and apply rust preventative where needed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Repair any damage to parking, slurry coat asphalt surfaces, re-striping all parking.
Good
Site: No issues observed.
Fair
Doors: Refresh exterior door finished surfaces as needed.
Fair
Exterior/Interior Windows: Repair and re-seal leaking aluminum window frames.
Good
Roof: Roof Assessment was performed through interior observation and from what could be seen from the ground. Roof is assumed to be original, installed with construction in 2004. No leaks were observed. No damage is apparent. Gutters appear to be clean and clear of obstruction. Gutters and downspouts have some minor damage. Roof appears to be in good condition. District should consider seeking an inspection by a licensed roofing contractor to determine if repairs or replacement is necessary, due to recent hail event.

Interior

Good
Interior Structure: No issues observed.
Good
Plumbing: No issues observed or reported.
Good
ADA: Facility appears mostly compliant.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Good
Electrical: No issues observed.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Deep clean, repair or replace ceramic tile flooring, re-grout, and re-seal surface.
Good
HVAC: No issues observed.

Priority Projects

  • Review Safety & Security Measures and perform security improvements.

Additional Projects, if Funds Become Available

  • Extend gutter spouts on south side to prevent water from standing against building.
  • Regrade soil at south parking lot to prevent erosion along sidewalk.
  • Reseal building envelope and repair rust damage.
  • Reseal and restripe parking lots.
  • Refresh or repaint exterior doors.
  • Repair and reseal aluminum window frames.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Poor
Security: Review and consider Safety & Security Recommendations on the Facility Details page.
Good
Administration: Office area in good condition and meets the needs of the campus.

Actions to Improve the Educational Environment

Review and consider Safety & Security Recommendations on the Facility Details page.