Chapel Hill ISD - Chapel Hill Junior High School - Field House

  • Year Built
    1987
  • Square Footage
    6,000
  • Replacement Cost
    $1,560,000
  • Condition Budget
    $723,363
  • Facility Condition Index
    53%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: No issues observed.
Good
Foundation: No issues observed.
Poor
Doors: Replace all doors.
Good
Exterior/Interior Windows: No issues observed.
Fair
Roof: Recommend replacing gutters, downspouts, seals and fasteners on this 34-year-old roof.

Interior

Fair
Interior Structure: Repaint interior walls. Repaint interior walls. Provide ceiling for 7th grade locker room. Clean and repaint open structure.
Poor
ADA: Restrooms are non -compliant. Locker rooms lack accessible locker locations.
Poor
Furnishing, Fixtures, Equipment: Replace restroom stalls. Replace equipment storage cabinets.
Good
Electrical: Provide lighting controls.
Fair
Safety/Security: Provide safety and security improvements.
Fair
Flooring: Replace damaged floor tiles. Repaint concrete floors.
Poor
HVAC: Replace restroom facilities. Replace one 3-ton HVAC unit. Upgrade controls and perform Testing & Balancing when replacing HVAC units.

Priority Projects

  • Provide safety and security improvements.
  • Replace one 3-ton HVAC unit; upgrade controls and perform Testing & Balancing when replacing HVAC units.
  • Replace restroom facilities.
  • Replace all doors.

Additional Projects, if Funds Become Available

  • Provide additional office space for coaches.
  • Provide walls to ceilings in restrooms, coaches office and equipment storage.
  • Provide adequate and appropriate laundry facilities.
  • Provide non-slip flooring in dressing areas.
  • Provide exterior CCTV coverage.
  • Provide electronic access control.
  • Repaint interior walls.
  • Provide ceiling for 7th grade locker room.
  • Clean and repaint open structure.
  • 34-year-old roof is in fair condition; recommend replacing seals and fasteners to extend life of roof.
  • Replace gutters and downspouts.
  • Locker rooms lack accessible locker locations.
  • Replace equipment storage cabinets.
  • Provide lighting controls.
  • Replace damaged floor tiles.
  • Repaint concrete floors.
  • Provide additional office space for coaches.
  • Provide walls to ceilings in restrooms, coaches office and equipment storage.
  • Provide adequate and appropriate laundry facilities Provide non-slip flooring in dressing areas.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Occupant Flow: There is adequate Occupant Flow space provided.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Fair
Physical Education: The locker room provides adequate space for dressing and equipment storage for the JH Boys' athletics program. The facility is sub standard when compared to similar campuses around the state.

Actions to Improve the Educational Environment

Finish upgrades, restroom renovations, coaches' office and laundry additions would all serve to improve the educational environment at this facility.