Chapel Hill ISD - Wise Elementary School - Gym

  • Year Built
    1987
  • Square Footage
    4,692
  • Replacement Cost
    $1,219,920
  • Condition Budget
    $66,279
  • Facility Condition Index
    6%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Poor
Exterior Structure: Re-seal building envelope. Check fasteners and flashings for fit and tightness.
Good
Foundation: No issues observed.
Poor
Doors: Refresh finished surfaces. Update door hardware to ADA compliant hardware.
Good
Roof: Continue maintenance as per manufacturer’s directions. Check gutters and downspouts for debris, remove as needed. Check fasteners and flashings for fit and tightness, repair or replace as needed to seal system.

Interior

Fair
Interior Structure: Refresh finished surface as needed. Replace damaged ceiling tile and consider updating to 2X2 tiles.
Poor
ADA: Install ADA complaint door hardware throughout facility. Update non-compliant restrooms and ramps.
Fair
Furnishing, Fixtures, Equipment: Update accessories as needed for ADA compliance. Update furniture and equipment as needed.
Poor
Electrical: Replace analog intercom. Review Safety and Security Recommendations.
Fair
Safety/Security: Review Safety and Security Recommendations.
Fair
Flooring: Repair damaged floor tiles.
Good
HVAC: No issues observed or reported. Note: HVAC units are 13 years old, consider replacement in the next 3 to 5 years.

Priority Projects

  • Re-seal building envelope.
  • Check fasteners and flashings on wall panels for fit and tightness.
  • Continue roof maintenance as per manufacturer's directions.
  • Check gutters and downspouts for debris, clear as needed.
  • Check fasteners and flashings for fit and tightness on the roof, repair or replace as needed.
  • Install ADA complaint door hardware throughout facility.
  • Replace analog intercom.
  • Review Safety and Security Recommendations.

Additional Projects, if Funds Become Available

  • Surface grading to provide positive stormwater drainage way from structure and prevent ponding next to foundation.
  • Refresh finished surfaces.
  • Repair damaged floor tiles.
  • Replace damaged ceiling tile and consider updating to 2X2 tiles.
  • Update accessories as needed for ADA compliance.
  • Update furniture and equipment as needed.
  • Review Safety and Security Recommendations.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Occupant Flow: Students were not on site during assessment.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Good
Site Playgrounds/Extra Curricular: Students were not on site during assessment, playgrounds appeared to be adequately sized.
Good
Physical Education: Gym is generally in good condition, adequate in size for elementary campus and satisfies basic physical education program needs.

Actions to Improve the Educational Environment

The educational environment of the facility is in good condition. District should review and consider Safety and Security Recommendations. Maintenance such as re-sealing the building envelope refreshing high touched surfaces are needed.