Chapel Hill ISD - Chapel Hill High School - Athletics

  • Year Built
    1987
  • Square Footage
    33,634
  • Replacement Cost
    $15,408,500
  • Condition Budget
    $7,391,022
  • Facility Condition Index
    55%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: Repaint exterior painted surfaces as needed.
Good
Foundation: No issues observed.
Fair
Site: Add site lighting.
Fair
Doors: Replace exterior wooden doors with HM. Repaint exterior HM and roll up doors. Replace obsolete door hardware (50%).
Good
Roof: Roofs of the Field House, Concession stands and Restroom buildings are in good condition. Continue regular inspections and maintenance.

Interior

Good
Interior Structure: Repaint walls in FH rooms as needed. Repaint walls in venue RR's(FB Home stands, Visitors', BB/SB).
Fair
ADA: Provide accessibility at Visitor's Concession, Visitors' grandstand, Baseball stadium, and Softball stadium.
Good
Furnishing, Fixtures, Equipment: Repair/replace concession equipment as needed. Replace restroom partitions as needed. Replace weight equipment for Girls' and Boys' weight rooms.
Poor
Electrical: Replace inefficient lighting with LED. Improve network band width and reliability. Replace overhead electrical service with underground.
Good
Safety/Security: Provide Safety and Security improvements.
Good
Flooring: Replace carpeting in girls' locker rooms. Replace damaged VCT as needed.
Poor
HVAC: Protect water supply at home Restroom building. Plan for replacement of sixteen 13-year-old units out of of 21 HVAC units at Field House within 2 years. (68 tons or 76% of capacity). Upgrade controls and perform testing and balancing when replacing HVAC Units.

Priority Projects

  • Add site lighting.
  • Protect water supply at home Restroom building.
  • Provide accessibility at Visitor's Concession, Visitors' grandstand, Baseball stadium, and Softball stadium.
  • Improve network capabilities in Field House.
  • Replace obsolete door hardware (50%).
  • Provide Safety and Security improvements.
  • Plan for replacement of sixteen 13-year-old units out of of 21 HVAC units at Field House within 2 years (68 tons or 76% of capacity).
  • Upgrade controls and perform testing and balancing when replacing HVAC Units.

Additional Projects, if Funds Become Available

  • Improve network capabilities in FH.
  • Replace sound system at Bulldog Stadium.
  • Provide additional practice areas.
  • Renovate Press Boxes at Bulldog Stadium.
  • Facility upgrades at BB & SB to include scoreboards, dugouts, batting cages, storage, seating, backstop netting.
  • Tennis: replace courts, fencing, lighting and equipment.
  • Replace turf at Bulldog Stadium.
  • ADA improvements to stands, Repaint rusting components of bleacher systems at Bulldog Stadium.
  • Repaint exterior painted surfaces as needed.
  • Repaint walls in FH rooms as needed.
  • Repaint walls in venue RR's(FB Home stands, Visitors', BB/SB).
  • Clean and repair gutters and downspouts as needed.
  • Repair/replace concession equipment as needed.
  • Replace restroom partitions as needed.
  • Replace weight equipment for Girls' and Boys' weight rooms.
  • Replace inefficient lighting with LED.
  • Replace overhead electrical service with underground.
  • Replace exterior wooden doors with HM.
  • Repaint exterior HM and roll up doors.
  • Replace carpeting in girls' locker rooms.
  • Replace damaged VCT as needed.
  • Replace sound system at Bulldog Stadium.
  • Provide additional practice areas.
  • Renovate Press Boxes at Bulldog Stadium.
  • Facility upgrades at BB & SB to include scoreboards, dugouts, batting cages, storage, seating, backstop netting.
  • Replace tennis courts, fencing, lighting and equipment.
  • Replace turf at Bulldog Stadium.
  • Repaint rusting components of bleacher systems at Bulldog Stadium.
  • RR improvements/replacements.
  • Provide 8 lane track w adequate number of jump venues.
  • Repair rubber track surfacing as needed.
  • Provide adequate storage for field equipment at Bulldog Stadium.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Occupant Flow: Circulation spaces are adequate for the facilities.
Good
Security: See Safety & Security recommendations on the Facility Details page.
Poor
Site Playgrounds/Extra Curricular: Site Athletics deficiencies create deficiencies for Extracurricular activities.
Fair
Physical Education: Interior spaces and facilities available for Physical Education and Athletics are adequately sized and equipped. HVAC, Finish and FFE upgrades should be planned for in the near future.
Good
Administration: Spaces dedicated for administrative functions are adequate.

Actions to Improve the Educational Environment

Improvements, replacements and additions to site athletics as well as finish and FFE upgrades will improve the educational environment for both the high school and junior high school athletics programs. All athletics facilities on this campus are shared by Boys' and Girls' athletics grades 7-12.