Chapel Hill ISD - Chapel Hill High School - IT

  • Year Built
    1987
  • Square Footage
    10,948
  • Replacement Cost
    $2,737,000
  • Condition Budget
    $1,246,810
  • Facility Condition Index
    52%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: Minor repairs needed on north side of building. Replace building sealants, minor tuck and point repairs needed.
Good
Foundation: No issues observed.
Good
Site: No issues observed.
Good
Doors: No issues observed.
Good
Exterior/Interior Windows: No issues observed.
Good
Roof: Clean and address ponding to extend life of roof. Continue regular inspections and maintenance to assist in realizing full expected life of the roof.

Interior

Good
Interior Structure: Replace 4x2 ceiling system. Stairs are missing compliant railings and railing is needed around chair lift in IT.
Good
ADA: Provide compliant building and room signage. Provide railings at stairs/chair lift in IT.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Fair
Electrical: Mechanical systems older than 30 years should be reviewed for replacement. Replace inefficient lighting with LED.
Good
Safety/Security: No issues observed.
Good
Flooring: No issues observed.
Good
HVAC: Mechanical systems older than 30 years should be reviewed for replacement. No issues observed.

Priority Projects

  • Stairs are missing compliant railings and railing is needed around chair lift in IT.
  • Clean and address ponding to extend life of roof.
  • Ensure warning signs related to fire suppression system are posted in and around NOC.
  • Perform Safety and Security improvements.
  • Provide compliant building and room signage.

Additional Projects, if Funds Become Available

  • Provide additional storage spaces.
  • Ensure warning signs related to fire suppression system are posted in and around NOC.
  • Expand use of electronic locks on the interior to maintain separation between Early College and IT spaces.
  • Provide compliant building and room signage.
  • Expand storage capacity of CCTV server.
  • Correct errant cable installation throughout district.
  • Provide Disaster Recovery Server.
  • Provide Generator and POE lighting at Administration.
  • Minor stucco repairs needed on north side of building.
  • Replace building sealants, minor tuck and point masonry repairs needed.
  • Replace 4x2 ceiling system.
  • Replace inefficient lighting with LED.
  • Provide additional storage spaces.
  • Expand storage capacity of CCTV server.
  • Correct errant cable installation throughout district.
  • Provide Disaster Recovery Server.
  • Provide Generator and POE lighting at Administration.
  • Upgrade IT identified access points to 10G.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Core Classrooms: The instructional spaces in this facility is spacious and well equipped.
Fair
Occupant Flow: Circulation spaces in the Early College area are ample for the area. Circulation spaces in IT blocked with furniture and technology equipment.
Good
Security: See Safety & Security recommendations on the Facility Details page.
Poor
Administration: IT officing and prep-shop in 'loft' area w low ceiling height, extremely crowded.

Actions to Improve the Educational Environment

Instructional spaces are adequate and well equipped for their assigned uses resulting in a very good educational environment.