Chapel Hill ISD - Chapel Hill High School - IT
- Year Built1987
- Square Footage10,948
- Replacement Cost$2,737,000
- Condition Budget$1,246,810
- Facility Condition Index52%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: Minor repairs needed on north side of building. Replace building sealants, minor tuck and point repairs needed.
Good
Foundation: No issues observed.
Good
Site: No issues observed.
Good
Doors: No issues observed.
Good
Exterior/Interior Windows: No issues observed.
Good
Roof: Clean and address ponding to extend life of roof. Continue regular inspections and maintenance to assist in realizing full expected life of the roof.
Interior
Good
Interior Structure: Replace 4x2 ceiling system. Stairs are missing compliant railings and railing is needed around chair lift in IT.
Good
ADA: Provide compliant building and room signage. Provide railings at stairs/chair lift in IT.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Fair
Electrical: Mechanical systems older than 30 years should be reviewed for replacement. Replace inefficient lighting with LED.
Good
Safety/Security: No issues observed.
Good
Flooring: No issues observed.
Good
HVAC: Mechanical systems older than 30 years should be reviewed for replacement. No issues observed.
Priority Projects
- Stairs are missing compliant railings and railing is needed around chair lift in IT.
- Clean and address ponding to extend life of roof.
- Ensure warning signs related to fire suppression system are posted in and around NOC.
- Perform Safety and Security improvements.
- Provide compliant building and room signage.
Additional Projects, if Funds Become Available
- Provide additional storage spaces.
- Ensure warning signs related to fire suppression system are posted in and around NOC.
- Expand use of electronic locks on the interior to maintain separation between Early College and IT spaces.
- Provide compliant building and room signage.
- Expand storage capacity of CCTV server.
- Correct errant cable installation throughout district.
- Provide Disaster Recovery Server.
- Provide Generator and POE lighting at Administration.
- Minor stucco repairs needed on north side of building.
- Replace building sealants, minor tuck and point masonry repairs needed.
- Replace 4x2 ceiling system.
- Replace inefficient lighting with LED.
- Provide additional storage spaces.
- Expand storage capacity of CCTV server.
- Correct errant cable installation throughout district.
- Provide Disaster Recovery Server.
- Provide Generator and POE lighting at Administration.
- Upgrade IT identified access points to 10G.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Core Classrooms: The instructional spaces in this facility is spacious and well equipped.
Fair
Occupant Flow: Circulation spaces in the Early College area are ample for the area. Circulation spaces in IT blocked with furniture and technology equipment.
Good
Security: See Safety & Security recommendations on the Facility Details page.
Poor
Administration: IT officing and prep-shop in 'loft' area w low ceiling height, extremely crowded.
Actions to Improve the Educational Environment
Instructional spaces are adequate and well equipped for their assigned uses resulting in a very good educational environment.