Lyford CISD - Main Campus - 1923 Building
- Year Built1923
- Square Footage10,156
- Replacement Cost$4,050,416
- Condition Budget$2,311,245
- Facility Condition Index82%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Poor
Exterior Structure: Significant cracking and damage to bricks. Repair damaged bricks and replace deteriorated grout. A structural evaluation of the building should be completed.
Fair
Foundation: Repair minor cracking at corners along perimeter.
Poor
Parking/Traffic: Drives and parking information included in the ES report. Overall fair to poor condition.
Fair
Site: Sidewalk information included in the ES report. Additional pole and perimeter lighting needed at all buildings and points of entry.
Fair
Doors: Replace all exterior wooden doors and frames. Replace all hardware is not ADA compliant.
Poor
Exterior/Interior Windows: Window units in poor condition and should be replaced.
Poor
Roof: Roof on the 1923 building is in poor condition and numerous water intrusions are visible inside the structure. Due to the age and the signs of deterioration, it should all be for replacement. Gutters and downspouts should be replaced at the time roof improvements are made.
Interior
Fair
Interior Structure: Repair isolated damage to wood floors in Administration building and Auditorium. Repair and repaint damaged surfaces in all buildings. Damage to surfaces in Travis ES and 1923 building that need to be replaced. Replace all termite damaged materials in the Auditorium. Replace damaged and sagging ceiling tiles with 2x4' system.
Plumbing: N/A
Poor
ADA: Accessibility is fair to poor overall. Non-compliant entryways, ramps, pathways between and within structures, restrooms and door hardware should all be improved.
Fair
Furnishing, Fixtures, Equipment: Replace all non-compliant and damaged restroom stalls and accessories. Replace damaged furniture and fixtures.
Fair
Electrical: Consider replacing electrical infrastructure that is 30 years old or older. Replace interior and exterior lighting with LED systems. Overhead power lines should be placed under ground.
Fair
Safety/Security: Review Safety and Security Recommendations on Facility Details page.
Fair
Flooring: Replace all damaged flooring and evaluate condition of subflooring at the time of replacement.
Fair
HVAC: HVAC unit was installed in 2012 and is in fair condition. Consider replacing all plumbing systems that are over 30 years old.
Priority Projects
- Repair all damage to exterior surfaces; structural evaluation of buildings should be completed.
- Replace all non-ADA complaint hardware.
- Replace roofing system.
Additional Projects, if Funds Become Available
- Bury overhead power lines.
- Additional pole lighting.
- Replace all damaged floor and wall finishes.
- Replace all exterior window systems.
- Add additional pole and perimeter lighting.
- Consider replacing all electrical and plumbing infrastructure that is 30 years or older.