Evant ISD - Main Campus - Special Pgm., Band, Bus Barn, Ag Barn, Field House and Gym (2000)

  • Year Built
    1975
  • Square Footage
    27,570
  • Replacement Cost
    $16,029,632
  • Condition Budget
    $20,427,703
  • Facility Condition Index
    148%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Paint exterior of the concessions building. Replace building seam calking on concessions and storage facilities. Replace damaged wood siding and soffit on Support Programs bld. and concessions building. Replace all damaged exterior metal panels and missing fasteners and calking. Replace building seam caulking.
Good
Foundation: No issues observed.
Poor
Parking/Traffic: Replace roadways and parking lots, restripe and add signage. Elk Stadium and track facilities information.
Poor
Site: Replace damaged pedestrian pathways and add ADA compliant routes at the football stadium and the track facility. Replace perimeter fencing and gates at Elk Stadium and track facilities. Install irrigation system at football, softball and baseball fields. Replace pole lighting at the Elk Stadium and Track facilities with LED.
Fair
Doors: Replace all damaged and deteriorated exterior metal doors and frames. Paint doors in fair condition and replace damaged hardware. Re-calk around all exterior doors. Replace damaged overhead metal garage doors and hardware at Ag barn Install rollup metal doors at concession windows at Elk Stadium and Track facilities. Replace damaged and missing interior wood doors and frames. Replace all damaged and non-ADA compliant door hardware. Replace damaged metal door panels and hardware. Paint all interior metal doors.
Poor
Exterior/Interior Windows: Replace all exterior window units on the Support Programs building and Field House.
Good
Roof: Metal roofing systems found on the Support Program building, Concession stand, Press Box, and band Hall are all past their useful life span and should be replaced. At the time of replacement, adjacent system such as soffits, fascia and gutters should be evaluated and all damaged areas replaced. Metal roofs on the Bus Barn and Gym (2000) are in fair condition, but are in need of manufacturer-recommended maintenance to replace missing sealants and fasteners and any damaged sections.

Interior

Fair
Interior Structure: Repaint interior CMU surfaces. Repair damaged wallboard and paint. Replace damaged interior wood paneling wallboard in Field House and paint all surfaces. Replace damaged and stained ceiling tiles and missing grid system. Consider replacing system with 2x2 grid system. Paint exposed structural components in Gym and Field house.
Poor
ADA: Campus facilities should have ADA compliant entrance, public areas, restrooms, drinking fountains, and areas within facility intended for use.
Fair
Furnishing, Fixtures, Equipment: Replace damaged restroom and locker room accessories, including stall dividers, dispensers and mirrors. Repair or replace aged or damaged lockers, cabinets, and countertops as needed. Replace damaged moveable furnishings as needed.
Poor
Electrical: Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Install LED lighting. Update to fiber cabling and devices to support secure Wi-Fi as needed. Incorporate Field house and Main Gym into central communication system. Review surveillance camera coverage for area covered and type of camera used, update where needed for adequate coverage. Install access control system on all designated entrance doors at the Special Programs bld., band Hall, gym and field house. Install intrusion alarm system on at the Special Programs bld., band Hall, gym and field house. Install fire alarm system in all student occupied facilities. Install lighting control system at the Special Programs bld., Gym, Filed House and Band Hall. Install vape detectors in restrooms at Gym and Field house.
Fair
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Replace damaged and stained carpet in Special Programs classrooms. Replace all damaged and deteriorated vinyl flooring. Patch and reseal all concrete flooring. Repair damaged sections of wood flooring and refinish.
Poor
HVAC: Replace all damaged, non-functioning and non-ADA plumbing hardware and fixtures. Replace plumbing systems that are over 30 years old, or non-functioning and install missing systems in student/staff occupied facilities. Replace HVAC units at or past their useful life expectancy. Update duct work as needed when HVAC units are replaced. Install web-based energy management system. Test and balance new HVAC units when installed. Update duct work, web-based energy management system, test, and balance new HVAC units when installed.

Priority Projects

  • Paint exterior of the concessions building.
  • Replace building seam calking on concessions and storage facilities.
  • Replace damaged wood siding and soffit on Support Programs bld.
  • and concessions building.
  • Replace all damaged exterior metal panels and missing fasteners and calking.
  • Replace building seam caulking.
  • Replace all damaged, non-functioning and non-ADA plumbing hardware and fixtures.
  • Replace roof systems, including soffits and fascia on the support services building, Field house, band hall, concessions and press box.
  • Replace all damaged metal panels and adjacent systems on the gym and bus barn.
  • Perform manufacturer-recommended maintenance.
  • Install ADA compliant pathways around and into facilities.
  • Replace non-ADA compliant hardware and plumbing fixtures.
  • Replace all damaged and deteriorated exterior metal doors and frames.
  • Paint doors in fair condition and replace damaged hardware.
  • Re-calk around all exterior doors.

Additional Projects, if Funds Become Available

  • Replace tennis courts.
  • Replace gutters and downspouts.
  • Track Restroom and concessions facility.
  • Replace insulation in field house building.
  • Repair football stadium bleachers.
  • Replace scoreboards at Elk Stadium and add scoreboards at track facility.
  • Replace track.
  • Replace stadium lighting with LED fixtures and add additional units.
  • Install bleachers.
  • Install restrooms in Band hall.
  • Gym bleacher repair.
  • Football stadium storage facility.
  • Repaint interior CMU surfaces.
  • Repair damaged wallboard and paint.
  • Replace damaged interior wood paneling wallboard in Field House and paint all surfaces.
  • Replace damaged and stained ceiling tiles and missing grid system.
  • Consider replacing system with 2x2 grid system.
  • Paint exposed structural components in Gym and Field house.
  • Replace plumbing systems that are over 30 years old, or non-functioning and install missing systems in student/staff occupied facilities.
  • Replace HVAC units at or past their useful life expectancy.
  • Update duct work as needed when HVAC units are replaced.
  • Install web-based energy management system.
  • Test and balance new HVAC units when installed.
  • Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
  • Replace roadways and parking lots, restripe, and add signage.
  • Elk Stadium and track facilities information.
  • Replace damaged restroom and locker room accessories, including stall dividers, dispensers, and mirrors.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Replace damaged pedestrian pathways and add ADA compliant routes at the football stadium and the track facility.
  • Replace perimeter fencing and gates at Elk Stadium and track facilities.
  • Install irrigation system at football, softball, and baseball fields.
  • Replace pole lighting at the Elk Stadium and Track facilities with LED.
  • Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Install LED lighting.
  • Update to fiber cabling and devices to support secure Wi-Fi as needed.
  • Incorporate Field house and Main Gym into central communication system.
  • Install lighting control system at the Special Programs bld, Gym, Filed House, and Band Hall.
  • Install vape detectors in restrooms at Gym and Field house.
  • Replace damaged overhead metal garage doors and hardware at Ag barn Install rollup metal doors at concession windows at Elk Stadium and Track facilities.
  • Replace damaged and missing interior wood doors and frames.
  • Replace all damaged and non-ADA compliant door hardware.
  • Replace damaged metal door panels and hardware.
  • Paint all interior metal doors.
  • Replace all exterior window units on the Support Programs building and Field House.
  • Replace damaged and stained carpet in Special Programs classrooms.
  • Replace all damaged and deteriorated vinyl flooring.
  • Patch and reseal all concrete flooring.
  • Repair damaged sections of wood flooring and refinish.
  • Replace tennis courts.
  • Replace gutters and downspouts.
  • Track Restroom and concessions facility.
  • Replace insulation in field house building.
  • Repair football stadium bleachers.
  • Replace scoreboards at Elk Stadium and add scoreboards at track facility.
  • Replace track.
  • Replace stadium lighting with LED fixtures and add additional units.
  • Install bleachers.
  • Install restrooms in Band Hall.
  • Gym bleacher repair.
  • Football stadium storage facility.
  • See Safety & Security recommendations on the Facility Details page.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Fair
Security: See Safety & Security recommendations on the Facility Details page.
Poor
Physical Education: Main Gym in good condition but utilized by all grades and lacks adequate space for all grade level programs.

Actions to Improve the Educational Environment

Facilities are deteriorated and conditions directly impact districts ability to utilize facilities for various programs.