Evant ISD - Main Campus - Main School and Ag. Shop
- Year Built1975
- Square Footage35,894
- Replacement Cost$22,732,670
- Condition Budget$17,344,085
- Facility Condition Index89%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Replace damaged and deteriorated panels. Replace all sealants and missing fasteners and paint. Replace all building seam calking and power wash exterior surfaces.
Good
Foundation: No issues observed.
Poor
Parking/Traffic: Replace existing roadways and parking lots, restripe and add signage.
Fair
Site: Replace damaged sections of walkways and ramps. Replace and add additional perimeter fencing and gates. Replace all exterior pole lighting with LED units.
Poor
Doors: Repaint exterior metal doors and replace damaged and non-ADA compliant hardware. Replace damaged frame and door to the mechanical room. Replace damaged panels and hardware. Replace damaged wood door and all non-ADA compliant and damaged hardware. Repair damaged metal panels and paint. Replace damaged hardware. Replace damaged metal doors and frames in shop.
Poor
Exterior/Interior Windows: Replace all exterior window units.
Poor
Roof: Roof systems on the Main building and Ag shop are both original to the facilities construction. Installed in 1975 both need to be replaced and adjacent systems should be evaluated for further damage and replacement. Gutters and downspouts are in fair to poor condition and should be replaced at the time of roof replacement.
Interior
Poor
Interior Structure: Replace all damaged portions of stairs and handrails. Replaced damaged sections of wallboard and repaint all interior wallboard surfaces. Replace all ceiling tiles and grid systems. Paint visible interior structure.
Poor
ADA: Restrooms and door hardware is not ADA compliant.
Fair
Furnishing, Fixtures, Equipment: Kitchen is undersized and equipment should be replaced and updated. Upgrade workstations and sink. Replace damaged restroom stalls and accessories. Repair or replace aged or damaged lockers, cabinets, and countertops as needed. Replace damaged moveable furnishings as needed.
Poor
Electrical: Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Install LED lighting. Install data system. See Safety & Security recommendations on the Facility Details page. Install lighting control system.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Replace stained and damaged sections of carpeted flooring. Abate and replace all vinyl flooring. Clean and reseal all concrete flooring. Replace damaged ceramic flooring and deteriorated grout.
Poor
HVAC: 9 out of 27 HVAC units (26% cooling capacity) have aged past their useful life span and should be replaced. Update duct work, web-based energy management system, test, and balance new HVAC units when installed. Install web-based energy management system. Test and balance new HVAC units when installed. Replace all damaged and non-ADA compliant restroom hardware. Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Priority Projects
- Replace damaged and deteriorated exterior metal panels.
- Replace all sealants and missing fasteners and paint.
- Replace all building seam calking and power wash exterior surfaces.
- Replace single-ply roof system on main building.
- Replace metal roofing system.
- Replace damaged restroom stalls and accessories.
- Repaint exterior metal doors and replace damaged and non-ADA compliant hardware.
- Replace damaged frame and door to the mechanical room.
Additional Projects, if Funds Become Available
- Replace playgrounds, canopy and fall material.
- Campus signage.
- Paint exterior handrails.
- Replace all damaged gutters and downspouts.
- Install perimeter lighting.
- Nurse addition.
- Kitchen addition.
- Library addition.
- Cafeteria addition.
- Lounge/workroom addition.
- Loading dock canopy.
- Replace Ag shop insulation.
- Install ventilation system in Ag. shop.
- Covered walkways.
- Replace all damaged portions of stairs and handrails.
- Replaced damaged sections of wallboard and repaint all interior wallboard surfaces.
- Replace all ceiling tiles and grid systems.
- Paint visible interior structure.
- 9 out of 27 HVAC units (26% cooling capacity) have aged past their useful life span and should be replaced.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
- Install web-based energy management system.
- Test and balance new HVAC units when installed.
- Replace all damaged and non-ADA compliant restroom hardware.
- Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
- Replace existing roadways and parking lots, restripe, and add signage.
- Designate separate areas for drop-off and pick-up for bus and car riders.
- Kitchen is undersized and equipment should be replaced and updated.
- Upgrade workstations and sink.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Replace damaged sections of walkways and ramps.
- Replace and add additional perimeter fencing and gates.
- Replace all exterior pole lighting with LED units.
- Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
- Install LED lighting.
- Install data system.
- Incorporate both facilities into central communication system.
- See Safety & Security recommendations on the Facility Details page.
- Install lighting control system.
- Replace damaged metal door panels and hardware.
- Replace damaged wood door and all non-ADA compliant and damaged hardware.
- Repair damaged metal roll-up door panels and paint.
- Replace damaged hardware.
- Replace damaged metal doors and frames in shop.
- Replace all exterior window units.
- Replace stained and damaged sections of carpeted flooring.
- Abate and replace all vinyl flooring.
- Clean and reseal all concrete flooring.
- Replace damaged ceramic flooring and deteriorated grout.
- Replace playgrounds, canopy and fall material.
- Campus signage.
- Paint exterior handrails.
- Replace all damaged gutters and downspouts.
- Install perimeter lighting.
- Nurse addition.
- Kitchen addition.
- Library addition.
- Cafeteria addition.
- Lounge/workroom addition.
- Loading dock canopy.
- Replace Ag Shop Insulation.
- Install ventilation system in Ag shop.
Utilization
47% Capacity: Low Utilized
Capacity
Pupil Count
Student Enrollment
204
Functional Capacity
436
Facility Condition Index
FCI: 89%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Poor
Core Classrooms: Classrooms are adequately sized but are generally in poor condition overall and need updating.
Poor
Visual and Performing Arts: Campus lacks designated space for visual or performing arts programs.
Poor
Cafeteria: Cafeteria and kitchen are undersized to adequately serve campus when campus is at or near full functional capacity.
Poor
Occupant Flow: Pedestrian traffic flow within the building is good but students and staff lack covered pathways between buildings. Vehicular traffic not separated for bus and personal vehicles.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Poor
Special Education: District lacks adequately sized space and accommodations for basic special education program needs.
Poor
Physical Education: Main Gym in good condition but utilized by all grades and lacks adequate space for all grade level programs.
Poor
Library: Library is undersized to adequately serve campus when campus is at or near full functional capacity.
Poor
Administration: Campus lacks administrative spaces for all programs and administrators.
Actions to Improve the Educational Environment
The educational environment of this facility is in fair condition at its best to poor condition depending on the area in question. Maintenance repairs are needed to reseal the building envelope, refresh finished surfaces, and update mechanical and plumbing systems.