Anderson-Shiro CISD - AS High School - CTE/Weight Room
- Year Built2010
- Square Footage11,400
- Replacement Cost$5,228,530
- Condition Budget$744,181
- Facility Condition Index17%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: Clean exterior walls and treat with algaecide. Paint exterior metal surfaces.
Good
Foundation: No issues observed or reported.
Fair
Parking/Traffic: Included in Main Building report.
Fair
Site: Provide additional pole mounted site lighting.
Fair
Doors: Paint exterior HM doors. Provide electronic access control. Repaint interior doors. Repaint interior doors.
Good
Exterior/Interior Windows: No issues observed or reported.
Good
Roof: There are several minor leaks causing water damage on the interior. Locate and repair these leaks. Provide regular maintenance procedures in accordance with the manufacturer's recommendations.
Interior
Fair
Interior Structure: Repaint interior walls. Repaint interior walls. Replace damaged 2x2 ceiling tiles. Clean high ceilings. Repaint high ceiling in CTE area.
Plumbing: N/A
Good
ADA: No issues observed or reported.
Good
Furnishing, Fixtures, Equipment: No issues observed or reported.
Good
Electrical: No issues observed or reported.
Good
Safety/Security: No issues observed or reported.
Good
Flooring: Repaint RR floors in CTE area.
Poor
HVAC: 2 units are 13 years old and have two years expected life remaining. Clean or replace HVAC grilles. Upgrade controls when replacing HVAC Units. Provide testing and balancing when replacing HVAC units.
Priority Projects
- Provide adequate flammable storage.
- Provide safety and security improvements.
- 2 units are 13 years old and have two years expected life remaining; upgrade controls and provide testing and balancing when replacing HVAC units.
- Accessible egress from all doors.
Additional Projects, if Funds Become Available
- Provide adequate flammable storage.
- Provide piping to connect downspouts to storm sewer.
- Provide canopies at all doors.
- Accessible egress from all doors.
- Provide additional storage in order to remove stored materials to allow 3' access area around electrical panels and equipment. Provide dedicated network closet.
- Provide a weight room in close proximity to the Field House.
- Convert existing weight room space into additional CTE spaces.
- Clean exterior walls and treat with algaecide.
- Paint exterior metal surfaces.
- Repaint interior walls.
- Replace damaged 2x2 ceiling tiles.
- Clean high ceilings & Repaint high ceiling in CTE area.
- Clean or replace HVAC grilles.
- Identify causes of interior water damage and repair roof.
- Paint exterior HM and all interior doors.
- Repaint RR floors in CTE area.
- Provide piping to connect downspouts to storm sewer.
- Provide canopies at all doors.
- Provide additional storage in order to remove stored materials to allow 3' access area around electrical panels and equipment.
- Provide dedicated network closet.
- Provide a weight room in close proximity to the Field House.
- Convert existing weight room space into additional CTE spaces.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Core Classrooms: Classrooms are well sized and equipped for the needs of the programs assigned to them.
Visual and Performing Arts:
Cafeteria:
Good
Occupant Flow: Space dedicated to circulation is adequate for the needs of the facility.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Fair
Physical Education: The weight room is well sized and equipped for the needs of the program. Location is an issue. The athletic program might be better served if the weight room were located closer to the Field House allowing current space to be converted to CTE spaces.
Library:
Administration:
Actions to Improve the Educational Environment
The educational environment at the CTE/Weight Room building is good. Spaces are well sized, equipped and lighted. The athletic program might be better served with the weight room closer to the Field House and a program evaluation is needed to determine if additional CTE space is needed. Improvements include finish upgrades, safety & security improvements, and HVAC upgrades.