Anderson-Shiro CISD - Maintenance - Main
- Year Built1988
- Square Footage8,700
- Replacement Cost$4,133,066
- Condition Budget$2,770,878
- Facility Condition Index78%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Paint canopy. Paint exterior wall panels. Replace damaged metal wall panels.
Good
Foundation: No Issues observed or reported.
Good
Parking/Traffic: Included in Elementary Main Building Report.
Fair
Site: Trim trees and shrubs away from buildings and rooflines. Regrade to provide positive drainage away from building and to repair erosion. Replace inefficient light fixtures with LED.
Poor
Doors: Paint doors. Replace obsolete door hardware, wooden doorframes, threshold at S door of Maintenance building to prevent further interior water damage, interior doors and hardware.
Poor
Exterior/Interior Windows: Replace single pane, aluminum windows.
Fair
Roof: Identify and repair the sources of interior water damage. Due to the age of the roofs, the district should begin planning for the replacement of all roofs.
Interior
Fair
Interior Structure: Paint interior walls. Repair and paint wallboard ceilings. Replace 4x2 acoustic ceiling system with 2x2. Clean and paint open deck areas.
Plumbing: N/A
Fair
ADA: Restrooms are not accessible, door hardward and signage needs to be improved.
Fair
Furnishing, Fixtures, Equipment: Most furnishings are old and damaged. Facilities lack appropriate shelving for storage of materials.
Fair
Electrical: Evaluate mechanical systems older than 30 years for replacement. Replace inefficient lighting with LED. Replace OH service with underground. Replace electrical switchgear.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Replace flooring in maintenance office, hallway and furniture storage areas. Sample and abate ACM as needed.
Poor
HVAC: Renovate RR's to provide accessible RR's. Evaluate mechanical systems older than 30 years for replacement. Replace HVAC grilles.
Priority Projects
- Provide Safety & Security recommendations listed the Facility Details page.
- Provide conditioning for spaces storing district records and furnishings.
- Conduct IAQ testing, take humidity control steps and mediate as needed.
- Provide adequate flammable storage.
- Renovate RR's to provide accessible RR's.
- Regrade to provide positive drainage away from building and to repair erosion.
- Provide adequate, accessible signage.
- Replace obsolete door hardware
Additional Projects, if Funds Become Available
- Remove abandoned restrooms.
- Provide conditioning for spaces storing district records and furnishings.
- Provide awnings at each entry.
- Provide adequate CCTV coverage.
- Renovate Maintenance building to more efficiently utilize the available space.
- Conduct IAQ testing, take humidity control steps and mediate as needed.
- Provide adequate ventilation in shop.
- Provide adequate flammable storage.
- Provide electronic access control.
- Provide adequate, accessible signage.
- Sample and abate ACM as needed.
- Replace flooring in maintenance office, hallway and furniture storage areas.
- Replace single pane, aluminum windows.
- Paint doors.
- Replace wooden doorframes, threshold at S door of Maintenance building to prevent further interior water damage, interior doors and hardware.
- Replace OH service with underground.
- Replace electrical switchgear.
- Replace inefficient lighting with LED.
- Trim trees and shrubs away from buildings and rooflines.
- Replace inefficient light fixtures with LED.
- Replace furnishings and provide additional appropriate shelving.
- Planning should begin for replacement of Maintenance and Athletic Storage buildings.
- Identify sources of interior water damage and repair.
- Evaluate mechanical systems older than 30 years for replacement.
- Paint interior walls.
- Repair and paint wallboard ceilings.
- Replace 4x2 acoustic ceiling system with 2x2.
- Clean and paint open deck areas.
- Paint canopy.
- Paint exterior wall panels.
- Replace damaged metal wall panels.
- Provide adequate ventilation in shop.
- Renovate Maintenance building to more efficiently utilize the available space.
- Provide awnings at each entry.
- Remove abandoned restrooms.
- Replace HVAC grilles.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Core Classrooms:
Visual and Performing Arts:
Cafeteria:
Good
Occupant Flow: Space provided for circulation is adequate for the needs of the building.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Physical Education:
Library:
Poor
Administration: Space allocated for administrative function is excessive and could be better utilized after a renovation of those spaces. Provisions could be made for storage areas for tools, materials and district records in climate controlled areas.
Actions to Improve the Educational Environment
Not applicable at this facility.