Anderson-Shiro CISD - AS High School - Field House/Athletics
- Year Built2014
- Square Footage8,000
- Replacement Cost$7,419,144
- Condition Budget$418,272
- Facility Condition Index7%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: Clean, seal and repaint dugout walls.
Good
Foundation: No issues observed or reported.
Fair
Parking/Traffic: Contained in Main building report.
Fair
Site: Correct drainage on SB field. Address moisture issues at dugouts.
Good
Doors: Reseal SB & BB press box doors to prevent further interior water damage.
Good
Exterior/Interior Windows: No issues observed or reported.
Good
Roof: Roofs are in good condition and have the bulk of their expected life remaining. There is evidence of water damage in the SB and BB press boxes. An investigation to ascertain the cause is needed, could be roof or door or windows. Continued maintenance and following the manufacturers' recommended maintenance tasks should assist in realizing the full expected life of each of these roofs.
Interior
Good
Interior Structure: Replace rotten flooring in SB and BB press boxes. Repaint interior walls as needed (25%). Repaint wallboard ceilings as needed (50%).
Plumbing: N/A
Good
ADA: No issues observed or reported.
Good
Furnishing, Fixtures, Equipment: Replace damaged backstop pads at SB.
Good
Electrical: Eliminate water intrusion through underground conduits at the FH.
Fair
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: No issues observed or reported.
Good
HVAC: No issues observed or reported.
Priority Projects
- Provide Safety & Security improvements.
- Reseal SB & BB press box doors to prevent further interior water damage and replace rotten flooring in SB and BB press boxes.
- Replace damaged backstop pads at SB.
- Correct drainage on SB field.
- Address moisture issues at dugouts.
- Eliminate water intrusion through underground conduits at the FH.
- Repair track and install structural topcoat at HS.
Additional Projects, if Funds Become Available
- Repair and resurface track including curb replacement foundation repair, rubber surface and structural topcoat at Aux Field.
- Repair track and install structural topcoat at HS.
- Remove old baseball infrastructure at ES (Aux Field).
- Remove old tennis infrastructure at ES Playground (Aux Field).
- Provide cover and lighting at SB and BB batting cages.
- Consider adding partitions in the FB press box.
- Replace sports field lighting at Aux Field.
- Provide adequate dehumidification in the FH.
- Provide adequate CCTV coverage for Field House and stadiums.
- Provide weight room adjacent to Field House.
- Provide practice fields adjacent to Field House.
- Clean, seal and repaint dugout walls.
- Repaint interior walls as needed (25%).
- Repaint wallboard ceilings as needed (50%).
- Provide cover and lighting at SB and BB batting cages.
- Consider adding partitions in the FB press box.
- Provide adequate dehumidification in the FH.
- Remove old baseball infrastructure at ES (Aux Field).
- Remove old tennis infrastructure at ES Playground (Aux Field).
- Repair and resurface track including curb replacement foundation repair, rubber surface and structural topcoat at Aux Field.
- Replace sports field lighting at Aux Field.
- Provide weight room adjacent to Field House.
- Provide practice fields adjacent to Field House.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Core Classrooms:
Visual and Performing Arts:
Cafeteria:
Good
Occupant Flow: Spaces provided for occupant flow are adequate for the needs of the facility.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Physical Education:
Library:
Administration:
Actions to Improve the Educational Environment
The educational environment is good at the Athletics facilities. Improvements include correction of ground water issue at baseball and softball, track repairs, safety and security improvements and minor finish repairs. Future needs include improvements at the Auxiliary stadium, consolidation of athletic facilities and a roof structure for the batting cages.