Football Athletics - Field House
- Year Built1977
- Square Footage7,959
- Replacement Cost$2,892,799
- Condition Budget$423,515
- Facility Condition Index17%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Trim trees away from building.
Good
Foundation: No issues observed or reported.
Fair
Parking/Traffic: Stripe and allocate appropriate ADA parking spaces.
Good
Site: No issues observed or reported.
Fair
Doors: Refinish exterior door and replace exterior doors as needed.
Good
Exterior/Interior Windows: No issues observed or reported.
Good
Roof: Area 1: Overall the roofs are in good condition. The metal awning on the track storage building is damaged. This section of the roof should be repaired. Trees around roofs should be trimmed away .The roofs should be inspected annually and after every significant weather event to maintain effectiveness.
Interior
Good
Interior Structure: Touch up interior paint as necessary. Replace glued up ceiling tile with new ceiling finish.
Plumbing: N/A
Poor
ADA: Additional ADA parking spaces, parking signage, accessible signage, and door hardware is needed.
Good
Furnishing, Fixtures, Equipment: No issues observed or reported.
Fair
Electrical: Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report. Update remaining light fixtures to LED fixtures. Update lighting control system.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Replace older and worn carpet. Repair liquid applied flooring as necessary.
Fair
HVAC: Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report. Update HVAC controls and instrumentation.
Priority Projects
- See Safety & Security recommendations on the Facility Details page.
- Trim trees away from building.
- Additional ADA parking spaces, parking signage, accessible signage, and door hardware is needed.
- Stripe parking lot near gym and allocate appropriate ADA parking spaces.
- Refinish exterior doors and replace exterior doors as necessary.
Additional Projects, if Funds Become Available
- Touch up interior paint as necessary.
- Replace glued up ceiling tile with new ceiling finish.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Update HVAC controls and instrumentation.
- Update remaining light fixtures to LED fixtures; update lighting control system.
- Replace older and worn carpet.
- Repair liquid applied flooring as necessary.
- Consider updating to a turf field.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Core Classrooms:
Visual and Performing Arts:
Cafeteria:
Good
Occupant Flow: Occupant flow appears adequate.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Physical Education:
Library:
Administration:
Actions to Improve the Educational Environment
The educational environment of the football athletic facility is in good condition. Security enhancements and ADA updates are needed.