High School - Ag Shop, Band Hall, Gym, Maintenance, and Trades

  • Year Built
    1965
  • Square Footage
    24,075
  • Replacement Cost
    $18,746,764
  • Condition Budget
    $6,006,856
  • Facility Condition Index
    38%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Repaint exterior metal paneling and masonry walls as needed. Repair damaged brick and mortar.
Poor
Foundation: Evidence of movement was observed at Ag Shop, Band Hall, Maintenance Building, and Trades Building. Consult with an engineer to determine cause and solutions for movement.
Fair
Parking/Traffic: Included with the High School Building.
Good
Site: No issues with the site were observed or reported.
Poor
Doors: Replace exterior wooden doors with metal doors. Refinish exterior doors and update door hardware to meet ADA compliance. Adjust vocational rollup door to be easily opened by one person.
Fair
Exterior/Interior Windows: Replace windows with energy efficient double pane windows.
Good
Roof: Area 1: The metal roofs overall are in good condition. Inspection of the caulking, vents, and seams indicate the need for minor repair. Trees should be trimmed away from the roofs to prevent access by animals and pests. Gutters should be cleaned of debris. The roof should be inspected annually and after every significant weather event to maintain effectiveness. Area 2: The built up gravel roof is in good condition. The roof should be inspected annually and after every significant weather event to maintain effectiveness. Area 3: The Ag shop roof is in good condition. Trees should be trimmed away from the roof to prevent access by animals and pests. Gutters should be cleaned of debris. The roof should be inspected annually and after every significant weather event to maintain effectiveness.

Interior

Fair
Interior Structure: Patch, repair, and repaint interior walls. Replace 4x2 drop ceiling tile with 2x2 ceiling tile. Replace stained ceiling tiles.
Plumbing: N/A
Fair
ADA: Overall the campus is meeting most of the ADA requirements. Accessible signage, and door hardware is needed.
Poor
Furnishing, Fixtures, Equipment: Significant mechanical and electrical upgrades are needed to bring the vocational building to a like new condition; including new electrical systems, LED lighting, and ventilation system for welding stations.
Poor
Electrical: Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report. Remove items stored in electrical and mechanical rooms, maintaining access to electrical panels. Update lighting to LED fixtures. Install lighting control system with new LED lighting.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Thoroughly deep clean carpets. If unable to thoroughly clean, replace carpets. Repair liquid applied flooring.
Poor
HVAC: Replace HVAC system components at or beyond useful life expectancy. Replace HVAC ductwork as needed after HVAC replacement. Replace HVAC controls and instrumentation. Test and balance new HVAC systems.

Priority Projects

  • See Safety & Security recommendations on the Facility Details page.
  • Evidence of movement was observed at Ag Shop, Band Hall, Maintenance Building, and Trades Building; Consult with an engineer to determine cause and solutions for movement.
  • Repair damaged brick and mortar.
  • Identify source of moisture in Trades Building Mechanical Room and remediate.
  • Replace damaged sink; replace outdated drinking fountains; and install additional drinking fountains.
  • Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
  • Replace HVAC system components at or beyond useful life expectancy; Replace HVAC ductwork as needed after HVAC replacement; Replace HVAC controls and instrumentation; Test and balance new HVAC systems.
  • Trees need to be trimmed away from roofs.
  • Clean out gutters of debris.
  • Inspect and repair caulkings on Band Hall roof.
  • Significant mechanical and electrical upgrades are needed to bring the vocational building to a like new condition; including new electrical systems, LED lighting, and ventilation system for welding stations.
  • Remove items stored in electrical and mechanical rooms, maintaining access to electrical panels.
  • Replace exterior wooden doors with metal doors.
  • Refinish exterior doors and update door hardware to meet ADA compliance.
  • Enclose walkways.

Additional Projects, if Funds Become Available

  • Auditorium
  • Enclosed Walkways
  • Repaint exterior metal paneling and masonry walls as needed.
  • Patch, repair, and repaint interior walls.
  • Replace 4x2 drop ceiling tile with 2x2 ceiling tile; Replace stained ceiling tiles.
  • Make ADA updates as needed including accessible signage and door hardware.
  • Update lighting to LED fixtures; Install lighting control system with new LED lighting.
  • Adjust vocational rollup door to be easily opened by one person.
  • Replace windows with energy efficient double pane windows.
  • Thoroughly deep clean or replace carpeted flooring.
  • Repair liquid applied flooring.
  • Consider constructing a Fine Arts Facility.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Core Classrooms:
Fair
Visual and Performing Arts: Band Hall is in fair to poor condition. There is not currently an adequate performance space in the district. An additional area should be considered for new Band Hall and performance space.
Cafeteria:
Fair
Occupant Flow: Occupant flow within the buildings is an issue as there are narrow hallways. Most movement occurs on the exterior of the buildings without canopies or enclosed walkways.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Good
Physical Education: The gym provides an adequate space for they Physical Education program.
Library:
Administration:

Actions to Improve the Educational Environment

The Vocational building needs updated building mechanical systems, foundation repair, and safety updates for the shop. The Band Hall building needs updated finishes and foundation repair.