Elementary School - 200 Wing
- Year Built1987
- Square Footage7,001
- Replacement Cost$3,937,231
- Condition Budget$4,155,093
- Facility Condition Index125%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Repaint exterior metal walls. Inspect and repair damaged grout and brick as necessary.
Poor
Foundation: Possible foundation movement was observed. Consider hiring an engineer to evaluate possible causes and solutions.
Fair
Parking/Traffic: Included with Elementary Office and 400 Wing.
Good
Site: No issues observed or reported.
Fair
Doors: Refinish exterior metal doors as necessary. Refinish interior doors as necessary.
Fair
Exterior/Interior Windows: Update single pane windows to double pane energy efficient windows. At a minimum, replace broken window panes.
Good
Roof: Area 1: Overall the roof is in good condition. The roof vents should be inspected and resealed as needed. The roof should be inspected annually and after every significant weather event to maintain effectiveness.
Interior
Fair
Interior Structure: Repaint interior walls.
Plumbing: N/A
Good
ADA: Overall the campus is mostly in compliance with ADA.
Good
Furnishing, Fixtures, Equipment: Repair damaged restroom stalls. Repair or replace moveable classroom furnishings as necessary.
Fair
Electrical: Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report. Update lighting to LED fixtures. Update lighting control system with LED fixtures.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Thoroughly clean floor and replace broken or missing floor tiles as necessary.
Poor
HVAC: Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report. Staff indicated issues with plumbing system. Replace HVAC system components at the end of useful life expectancy. Test and balance HVAC systems. Upgrade HVAC controls and instrumentation.
Priority Projects
- Investigate possible foundation movement; consider hiring an engineer to evaluate possible causes and solutions.
- Replace HVAC system components at the end of useful life expectancy; test and balance new HVAC systems; and upgrade HVAC controls and instrumentation.
- Inspect and reseal roof vents.
- Replace door weather stripping.
- See Safety & Security recommendations on the Facility Details page.
Additional Projects, if Funds Become Available
- Enclosed walkways
- Restroom addition
- Repair damaged grout and brick as necessary.
- Repaint exterior metal walls.
- Repaint interior walls.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Repair damaged restroom stalls.
- Repair or replace moveable classroom furnishings as necessary.
- Update lighting to LED fixtures; and lighting control system.
- Replace door hardware and refinish exterior metal doors.
- Refinish interior doors as necessary.
- Update single pane windows to double pane energy efficient windows; At a minimum, replace broken windowpanes.
- Thoroughly clean floor and replace broken or missing floor tiles as necessary.
- Construct enclosed walkways in-between buildings.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Fair
Core Classrooms: While classrooms are generally in fair to good condition three classrooms are undersized by current standards. Updating classroom lighting and finishes is recommended.
Visual and Performing Arts:
Cafeteria:
Good
Occupant Flow: Occupant flow at the building occurs on the exterior. Consider enclosing walkways.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Physical Education:
Library:
Administration:
Actions to Improve the Educational Environment
The educational environment of the facility is in good to fair condition. Security enhancements to the facility should be made. Updating lighting systems and classroom finishes are recommended to improve the educational environment.