Deweyville High School and Middle School
- Year Built2002
- Square Footage110,208
- Replacement Cost$76,091,041
- Condition Budget$13,712,600
- Facility Condition Index21%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Repaint exteriors of athletic facilities. Replace damaged metal siding along CTE building. Replace building seam calking and damaged masonry.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Top-coat and re-stripe parking lots.
Fair
Site: See Safety & Security recommendations on the Facility Details page.
Fair
Doors: Repaint all exterior metal doors and replace damaged hardware. Replace metal doors on ticket booths, storage facilities, and press boxes for all athletic fields. Replace damaged hardware and accessories on overhead doors. Replace damaged wood doors in band hall. Repaint interior metal doors and frames.
Fair
Exterior/Interior Windows: Replace caulking around window units on main building. Replace all windows and frames on ticket booths.
Fair
Roof: Roof systems on the main building are in fair to poor condition and major components need to be replaced. The single ply roof system is in poor condition and shows signs of damage, ponding and bubbling and should be replaced. The metal roof needs to be cleaned and manufacture-recommended maintenance should be implemented, including replacing calking and fasteners. All gutters and downspouts should be replaced at the time of roof repairs, and any damaged fascia and soffits should be replaced as well. Metal canopies around the campus are in good condition but maintenance and cleaning should be implemented. Roof systems on the athletic field facilities are in fair condition, but the fascia and soffits have damaged sections that need to be replaced to ensure the integrity of the overall system.
Interior
Fair
Interior Structure: Repaint interior masonry surfaces. Repair and repaint damaged wallboard surfaces in main building and press box. Replace stained and sagging ceiling tiles. Replace grid system and tiles in the football press box. Paint interior tectum panels. Paint interior decking in gym.
Plumbing: N/A
Good
ADA: No issues observed.
Fair
Furnishing, Fixtures, Equipment: Replace all damaged restroom and locker room accessories. Repair damaged casework and fixed furnishings in classrooms, band hall, locker rooms and offices. Replace damaged and deteriorated furnishings in classrooms and cafeteria.
Fair
Electrical: Replace all lighting with LED fixtures in the main building and the football press box.
Fair
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Replace damaged and stained carpet flooring. Replace damaged floor tiles. Repair minor cracking in concrete flooring. Replace damaged floor tiles. Replace damaged sections of wood flooring in gym.
Good
HVAC: Replace damaged plumbing fixtures and accessories.
Priority Projects
- Replace damaged metal siding along CTE building.
- Replace building seam calking and damaged masonry.
- Replace damaged plumbing fixtures and accessories.
- Replace single-ply roofing system.
- Replace all gutters and downspouts.
- Clean, replace missing fasteners and calking on metal roof.
- Replace caulking around window units on main building.
- Replace all windows and frames on ticket booths.
- See Safety & Security recommendations on the Facility Details page.
Additional Projects, if Funds Become Available
- Replace gutters and downspouts.
- Power washing.
- Bleachers.
- Re-key campus.
- Kitchen addition.
- Library addition.
- Repaint exteriors of athletic facilities.
- Repaint interior masonry surfaces.
- Repair and repaint damaged wallboard surfaces in main building and press box.
- Replace stained and sagging ceiling tiles.
- Replace grid system and tiles in the football press box.
- Paint interior tectum panels.
- Paint interior decking in gym.
- Top-coat and re-stripe parking lots.
- Replace all damaged restroom and locker room accessories.
- Repair damaged casework in classrooms, band hall and offices.
- Replace damaged and deteriorated furnishings in classrooms and cafeteria.
- Replace all lighting with LED fixtures in the main building and the football press box.
- Repaint all exterior metal doors and replace damaged hardware.
- Replace metal doors on ticket booths, storage facilities, and press boxes for all athletic fields.
- Replace damaged hardware and accessories on overhead doors.
- Replace damaged wood doors in band hall.
- Repaint interior metal doors and frames.
- Replace damaged and stained carpet flooring.
- Replace damaged floor tiles.
- Repair minor cracking in concrete flooring.
- Replace damaged sections of wood flooring in gym.
- Power-wash exterior of buildings.
- Kitchen addition.
- Library addition.
- Replace damaged baseball and softball bleachers.
Utilization
43% Capacity: Low Utilized
Capacity
Pupil Count
Student Enrollment
280
Optimum Capacity
653
Facility Condition Index
FCI: 21%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Core Classrooms: Classrooms are in good condition and adequately sized.
Good
Visual and Performing Arts: Rooms are generally in good condition and satisfies basic program needs.
Poor
Cafeteria: Kitchen is undersized to adequately serve campus when campus is at or near full functional capacity.
Good
Occupant Flow: Pedestrian traffic flow within the building is good.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Good
Special Education: Rooms are generally in good condition and seem to satisfy the basic special education program needs.
Good
Physical Education: Gym is adequately sized for campus and satisfies the basic physical education program needs.
Fair
Library: Library is undersized to adequately serve this campus when campus is at or near full functional capacity.
Good
Administration: Office area in good condition and meets the needs of the campus.
Actions to Improve the Educational Environment
The educational environment of the facility is in good condition.