Gonzales ISD - Administration (East Avenue Primary-Original Buildings (100, 300, 400, 500 Buildings))

  • Year Built
    1959
  • Square Footage
    34,148
  • Replacement Cost
    $12,817,793
  • Condition Budget
    $2,747,069
  • Facility Condition Index
    31%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Exterior structure is generally in good-to-fair condition. Repair of brick cracks is needed at 100 and 500 buildings. Repainting of wood siding is needed on 100 building. Cleaning of metal siding is needed on all buildings.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Repair and reseal asphalt parking and driveway surfaces (including north lot across street).
Fair
Site: Canopies are needed at playgrounds, along with repair of playground fall surfaces. Repainting of structural elements of campus canopies and walkway covers is needed.
Fair
Doors: Repair and repainting of all interior wood doors is needed.
Good
Exterior/Interior Windows: Windows are generally in good condition.
Good
Roof: N/A

Interior

Fair
Interior Structure: Interior structure is generally in good-to-fair condition. Cleaning and repainting of masonry walls is needed. Repair and repainting of wood panel walls is needed in buildings 300, 400, and 500. Replacement of ceiling tiles is needed in 300, 400, and 500 buildings.
Plumbing: N/A
Fair
ADA: Generally good ADA access on campus. Improvements needed to exterior ramp at west end of 100 building, maneuvering clearance at classroom doors in 100 building, and access to playgrounds and equipment.
Good
Furnishing, Fixtures, Equipment: FFE is in good condition.
Fair
Electrical: Replacement of electrical and lighting infrastructure older than 30 years is needed.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Flooring is generally in good-to-fair condition. Replacement of VCT is needed in 300 building, and cleaning of carpet is needed in 100 building.
Fair
HVAC: The plumbing infrastructure is greater than 30 years old and should be considered for replacement. The HVAC systems are in good condition.

Priority Projects

  • Repair brick cracks at 100 and 500 building.
  • See Safety & Security recommendations on the Facility Details page.
  • Provide ADA improvements on campus to increase access for students, staff, and visitors.

Additional Projects, if Funds Become Available

  • Repair and repave all asphalt parking and drive surfaces.
  • Repaint structural elements of campus canopies and walkway covers.
  • Repair and repaint interior wood doors.
  • Replace electrical and lighting infrastructure older than 30 years.
  • Replace plumbing infrastructure older than 30 years.

Actions to Improve the Educational Environment