Gonzales ISD - Administration (East Avenue Primary- Added Buildings)
- Year Built1993
- Square Footage37,164
- Replacement Cost$8,361,900
- Condition Budget$570,345
- Facility Condition Index7%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Exterior structure is generally in good condition. Cleaning of metal siding is needed on all buildings.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Repair and reseal asphalt parking and driveway surfaces (including north lot across street).
Good
Site: No issues observed.
Good
Doors: Doors are in good condition.
Good
Exterior/Interior Windows: Windows are generally in good condition.
Good
Roof: N/A
Interior
Fair
Interior Structure: Interior structure is generally in good condition. Repair and repainting of gym ceiling is needed.
Plumbing: N/A
Good
ADA: Generally good ADA access on campus.
Good
Furnishing, Fixtures, Equipment: FFE is in good condition.
Good
Electrical: Electrical systems are in good condition.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Flooring is generally in good condition.
Good
HVAC: The plumbing and HVAC systems are in good condition.
Priority Projects
- Security improvements needed to create a more secure campus environment.
Additional Projects, if Funds Become Available
- Clean metal siding on all buildings.
- Repair and repaint gym ceiling.
- Construct library addition to better serve campus population when campus is at or near full functional capacity.
Actions to Improve the Educational Environment
The educational environment of the facility is in good condition. Security enhancements to campus should be made. Minor maintenance improvements are needed.