Gonzales ISD - Support Facilities - Apache Field
- Year Built1960
- Square Footage32,650
- Replacement Cost$6,827,500
- Condition Budget$5,587,540
- Facility Condition Index56%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Exterior structures are in good-to-fair condition. Repainting of bleacher structural components is needed. Repair and repainting of wood and metal walls at support buildings is needed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Repave gravel lots with asphalt surfaces.
Fair
Site: Replacement of natural grass field with artificial turf is needed.
Fair
Doors: Repainting of exterior metal doors is needed.
Good
Exterior/Interior Windows: Press box windows are in good condition.
Good
Roof: N/A
Interior
Fair
Interior Structure: Interior structures are in good-to-fair condition. Repair and repainting of interior walls is needed. Replacement of ceiling tiles is needed in visitors dressing rooms.
Plumbing: N/A
Poor
ADA: Generally fair-to-poor ADA access on site. Improvements needed to ADA ramps, additional sidewalks, ADA parking, and restrooms.
Fair
Furnishing, Fixtures, Equipment: Replacement of restroom stalls is needed at visitors dressing room and visitors restrooms.
Fair
Electrical: Replacement of electrical infrastructure older than 30 years is needed.
Good
Safety/Security: Safety and security levels appear adequate.
Fair
Flooring: Replacement of press box carpeting is needed.
Fair
HVAC: Older plumbing fixtures in visitors locker room and restrooms are in need of replacement. Plumbing infrastructure older than 30 years is in need of replacement.
Priority Projects
- Provide ADA improvements at complex to increase access for students, staff, and visitors.
- Hire an engineer to investigate the structural integrity of the bleacher structures and light poles.
Additional Projects, if Funds Become Available
- Repave gravel lots with asphalt paving.
- Replace grass field with artificial turf playing field.
- Repaint structural components of bleachers, exterior wood and metal walls at support facilities, and exterior metal doors.
- Repair and repaint interior walls of support facilities.
- Replace carpeting in the press box.
- Replace older plumbing fixtures and stalls in visitors locker rooms and restrooms.
- Replace electrical and lighting infrastructure older than 30 years.
- Replace plumbing infrastructure older than 30 years.
Utilization
0% Capacity: Low Utilized
Capacity
Pupil Count
Student Enrollment
Functional Capacity
Facility Condition Index
FCI: 56%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Core Classrooms: Not applicable at this facility.
Visual and Performing Arts: Not applicable at this facility.
Cafeteria: Not applicable at this facility.
Occupant Flow: N/A
Good
Security: Security levels appear adequate.
Site Playgrounds/Extra Curricular: Not applicable at this facility.
Special Education: Not applicable at this facility.
Physical Education: Not applicable at this facility.
Library: Not applicable at this facility.
Administration: Not applicable at this facility.
Actions to Improve the Educational Environment
N/A, this is an athletic facility and it is not used for educational purposes, but provides a competitive football and soccer field for the district's athletic programs.