Gonzales ISD - Support Facilities - Old Water Co-Op Building
- Year Built1990
- Square Footage6,400
- Replacement Cost$2,402,304
- Condition Budget$909,585
- Facility Condition Index55%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Exterior structure is generally in good condition. Power washing of metal siding on main building is needed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Repave asphalt parking area.
Good
Site: No issues observed.
Fair
Doors: Repaint exterior doors.
Fair
Exterior/Interior Windows: Replacement of windows is needed.
Good
Roof: N/A
Interior
Fair
Interior Structure: Building interior is gutted and unfinished; building will need complete interior renovation and rebuild.
Plumbing: N/A
Fair
ADA: ADA improvements needed as part of any renovation project.
Fair
Furnishing, Fixtures, Equipment: No FFE at this time.
Good
Electrical: Electrical system appears adequate at this time.
Poor
Safety/Security: Safety and security systems needed as part of any renovation project.
Fair
Flooring: Flooring is currently bare concrete.
Fair
HVAC: Currently no interior plumbing or HVAC systems.
Priority Projects
- No priority projects at this time.
Additional Projects, if Funds Become Available
- Substantial interior renovation and rebuild needed to bring interior space into useable condition; renovation needs to also address safety/security and ADA provisions.
- Repave asphalt parking area.
- Replace windows.
- Repaint exterior doors.
- Clean (power wash) exterior metal panels on main building.
- Repair damaged downspouts.
Utilization
0% Capacity: Low Utilized
Capacity
Pupil Count
Student Enrollment
Functional Capacity
Facility Condition Index
FCI: 55%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Core Classrooms: Not applicable at this facility.
Visual and Performing Arts: Not applicable at this facility.
Cafeteria: Not applicable at this facility.
Occupant Flow: N/A
Poor
Security: Safety and security improvements needed as part of any renovation project.
Site Playgrounds/Extra Curricular: Not applicable at this facility.
Special Education: Not applicable at this facility.
Physical Education: Not applicable at this facility.
Library: Not applicable at this facility.
Fair
Administration: Interior is currently gutted and unfinished.
Actions to Improve the Educational Environment
N/A, this is currently a vacant facility and it is not used for educational purposes, but provides space for future needs identified by the district.