Gonzales ISD - Support Facilities - Maintenance & Transportation Complex
- Year Built1990
- Square Footage14,665
- Replacement Cost$6,966,828
- Condition Budget$1,262,687
- Facility Condition Index26%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: Exterior structures are generally in good condition. Exteriors of portable buildings are in fair-to-poor condition.
Good
Foundation: No issues observed.
Good
Parking/Traffic: Asphalt and concrete parking surfaces are in good condition. Some minor cracks in transportation yard asphalt may need attention in coming years.
Good
Site: No issues observed.
Fair
Doors: Repainting of exterior metal doors at transportation barn and maintenance building is needed, and repainting of interior metal doors at transportation office and barn and in maintenance storage area is needed.
Good
Exterior/Interior Windows: Windows are in good condition.
Good
Roof: N/A
Interior
Fair
Interior Structure: Interior structures are generally in good condition. Ceiling tiles need replacement in transportation office. Interiors of portable buildings are in fair-to-poor condition.
Plumbing: N/A
Fair
ADA: Generally good ADA access on site. Improvements needed to interior room signage, handrails at mezzanine stairs in maintenance building, transportation barn and maintenance office thresholds, entry platform at maintenance office, and accessible ADA parking spaces (including designation of van accessible space).
Good
Furnishing, Fixtures, Equipment: FFE is in good condition.
Good
Electrical: Electrical system is in good condition.
Good
Safety/Security: No issues observed.
Fair
Flooring: Replacement of carpeting in maintenance office and VCT in transportation barn breakroom is needed.
Fair
HVAC: Plumbing and HVAC systems are generally in good condition. Replacement of plumbing fixtures in transportation shop restroom is needed.
Priority Projects
- Provide ADA improvements at building to increase access for staff and visitors.
Additional Projects, if Funds Become Available
- Repaint interior wallboard walls and replace ceiling tiles.
- Replace carpeting in maintenance office and VCT in transportation barn breakroom.
- Replace plumbing fixtures in transportation shop restroom.
- Renovate portable buildings, or replace with permanent structure.
Utilization
0% Capacity: Low Utilized
Capacity
Pupil Count
Student Enrollment
Functional Capacity
Facility Condition Index
FCI: 26%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Core Classrooms: Not applicable at this facility.
Visual and Performing Arts: Not applicable at this facility.
Cafeteria: Not applicable at this facility.
Occupant Flow: N/A
Good
Security: Security systems appear adequate.
Site Playgrounds/Extra Curricular: Not applicable at this facility.
Special Education: Not applicable at this facility.
Physical Education: Not applicable at this facility.
Library: Not applicable at this facility.
Good
Administration: Office areas are in good-to-fair condition and meet the needs of the facility.
Actions to Improve the Educational Environment
N/A, this is a maintenance and transportation complex and it is not used for educational purposes, but provides office and work space for the district's maintenance and transportation departments.