Gonzales ISD - Gonzales High School - Vocational Building

  • Year Built
    1967
  • Square Footage
    18,240
  • Replacement Cost
    $12,094,068
  • Condition Budget
    $709,969
  • Facility Condition Index
    7%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Exterior structure is in good-to-fair condition. Repainting of tilt-up concrete exterior walls is needed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Most asphalt parking surfaces and drives are in fair condition. Repair and reseal of all asphalt surfaces is needed.
Good
Site: No issues observed.
Fair
Doors: Repainting and refinishing of interior doors is needed.
Fair
Exterior/Interior Windows: Replacement of glazing compound is needed on all windows.
Fair
Roof: N/A

Interior

Fair
Interior Structure: Interior structure is in good-to-fair condition. Cleaning of vinyl walls and repainting of wallboard walls is needed. Replacement of ceiling tiles and repainting of exposed structure ceilings is needed.
Fair
ADA: Generally good ADA access within building. Improvements needed to provide accessible restrooms.
Fair
Furnishing, Fixtures, Equipment: FFE is generally in good condition. Replacement of older restroom and locker room stalls is needed.
Fair
Electrical: Replacement of electrical and lighting infrastructure older than 30 years is needed.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Replacement of VCT flooring is needed.
Poor
HVAC: 3 out of 3 units (100% of cooling and heating capacity) have aged past their useful life span and should be replaced. Update duct work, web-based energy management system, test, and balance new HVAC units when installed.

Priority Projects

  • Replace of built-up gravel roof.
  • Security improvements needed to create a more secure building environment.
  • Provide ADA improvements within building to increase access for students, staff, and visitors.
  • 3 out of 3 units (100% of cooling and heating capacity) have aged past their useful life span and should be replaced.

Additional Projects, if Funds Become Available

  • Repaint tilt-up concrete walls.
  • Replace glazing compound all windows.
  • Repaint exterior metal doors and refinish interior wood doors.
  • Clean vinyl walls, and repair and repaint wallboard walls.
  • Replace VCT flooring.
  • Replace ceiling tiles and repaint exposed structure ceilings.
  • Replace older plumbing fixtures and stalls in student restrooms.
  • Replace electrical and lighting infrastructure older than 30 years.
  • Replace plumbing infrastructure older than 30 years.
  • Update Energy Management system as needed when new HVAC units are installed.
  • Test and balance new HVAC units when installed.
  • Update duct work as needed when HVAC units are replaced.

Utilization

89% Capacity: Highly Utilized

Capacity

Pupil Count

Student Enrollment

837

Functional Capacity

938

Facility Condition Index

FCI: 7%

Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Core Classrooms: Rooms are generally in good condition.
Poor
Security: See Safety & Security recommendations on the Facility Details page.

Actions to Improve the Educational Environment

The educational environment of the facility is in good condition. Security enhancements to the building should be made. Minor maintenance improvements are needed.