Gonzales ISD - Gonzales High School - Gym/Classroom Building
- Year Built1999
- Square Footage27,961
- Replacement Cost$14,595,223
- Condition Budget$745,453
- Facility Condition Index7%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Fair
Exterior Structure: Exterior structure is generally in good condition. Cleaning of CMU stains and recaulking of expansion joints is needed. Repainting of metal structure at front entry porch is needed.
Fair
Foundation: District staff survey reported foundation concerns; district should hire an engineer to investigate and identify any potential problems.
Fair
Parking/Traffic: Most asphalt parking surfaces and drives are in fair condition. Repair and reseal of all asphalt surfaces is needed.
Good
Site: No issues observed.
Good
Doors: Doors are generally in good condition.
Good
Exterior/Interior Windows: Windows are generally in good condition.
Good
Roof: N/A
Interior
Fair
Interior Structure: Interior structure is generally in good condition. Repainting of CMU and wallboard walls is needed.
Plumbing: N/A
Good
ADA: Good ADA access within building.
Good
Furnishing, Fixtures, Equipment: FFE is generally in good condition.
Good
Electrical: Electrical system is in good condition.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Replacement of VCT and cleaning of carpeting is needed.
Good
HVAC: HVAC and plumbing systems are in good condition.
Priority Projects
- Hire engineer to investigate and identify any potential foundation problems.
- Security improvements needed to create a more secure building environment.
- Provide ADA improvements on campus to increase access for students, staff, and visitors.
Additional Projects, if Funds Become Available
- Clean stains on exterior CMU walls and recaulk expansion joints; repaint metal structure at front entry porch.
- Reseal gutter joints.
- Repaint interior CMU and wallboard walls.
- Replace VCT flooring.
- Construct library addition to better serve campus population when campus is at or near full functional capacity.
Utilization
89% Capacity: Highly Utilized
Capacity
Pupil Count
Student Enrollment
837
Functional Capacity
938
Facility Condition Index
FCI: 7%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Core Classrooms: Rooms are generally in good condition.
Visual and Performing Arts: Not applicable at this facility.
Cafeteria: Not applicable at this facility.
Occupant Flow: N/A
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular: Not applicable at this facility.
Special Education: Not applicable at this facility.
Good
Physical Education: Gym is generally in good condition and satisfies basic physical education program needs. Locker rooms are in good condition.
Fair
Library: Library is in good condition, but is undersized to adequately serve campus when campus is at or near full functional capacity.
Administration: Not applicable at this facility.
Actions to Improve the Educational Environment
The educational environment of the facility is in good condition. Security enhancements to the building should be made. Minor maintenance improvements are needed.