Gonzales ISD - North Avenue Intermediate - Gym Building
- Year Built1980
- Square Footage6,000
- Replacement Cost$4,672,091
- Condition Budget$409,961
- Facility Condition Index11%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: Exterior metal panel structure is generally in good condition.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Parking surfaces are in fair condition; cracking and damage was observed. Repair and reseal of parking areas is needed.
Good
Site: No issues observed.
Fair
Doors: Repaint exterior metal doors.
Good
Roof: N/A
Interior
Fair
Interior Structure: Interior structure is generally in good-to-fair condition. Repainting of wallboard walls is needed.
Good
ADA: Generally good ADA access on campus at this building.
Good
Furnishing, Fixtures, Equipment: FFE is generally in good condition.
Fair
Electrical: Replace electrical and lighting infrastructure older than 30 years.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Rubber gym floor is in fair-to-poor condition and should be replaced.
Poor
HVAC: 3 out of 3 units (100% of cooling and heating capacity) have aged past their useful life span and should be replaced. Aging mechanical infrastructure should be addressed at the time of unit replacement. Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
Priority Projects
- Security improvements needed to create a more secure campus environment.
- 3 out of 3 units (100% of cooling and heating capacity) have aged past their useful life span and should be replaced.
Additional Projects, if Funds Become Available
- Repaint exterior metal doors.
- Repaint wallboard walls.
- Replace electrical and lighting infrastructure older than 30 years.
- Replace plumbing infrastructure older than 30 years.
- Update Energy Management system as needed when new HVAC units are installed.
- Test and balance new HVAC units when installed.
- Update duct work as needed when HVAC units are replaced.
Utilization
67% Capacity: Moderately Utilized
Capacity
Pupil Count
Student Enrollment
420
Functional Capacity
627
Facility Condition Index
FCI: 11%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Good
Physical Education: Gym is generally in good condition and provides an adequate physical education environment.
Actions to Improve the Educational Environment
The educational environment of the facility is in good condition; however, campus layout with multiple buildings is not conducive to modern learning strategies. Security enhancements to campus should be made. Minor maintenance improvements are needed.