Gonzales ISD - North Avenue Intermediate - Band Hall Building
- Year Built2016
- Square Footage3,724
- Replacement Cost$2,094,308
- Condition Budget$46,082
- Facility Condition Index3%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: Exterior structure is in good condition.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Parking surfaces are in fair condition; cracking and damage was observed. Repair and reseal of parking areas is needed.
Good
Site: No issues observed.
Good
Doors: Interior and exterior doors are in good condition.
Good
Exterior/Interior Windows: Windows are in good condition.
Good
Roof: N/A
Interior
Fair
Interior Structure: Interior structure is in good condition. Repainting of wallboard walls is needed.
Good
ADA: ADA access to and within this building is good.
Good
Furnishing, Fixtures, Equipment: FFE is generally in good condition.
Good
Electrical: Electrical infrastructure is in good condition.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Flooring is in good condition.
Good
HVAC: No issues observed or reported; the HVAC unit that serves this site is nearing the end of its useful life and replacement should be anticipated. Aging mechanical infrastructure should be addressed at the time of unit replacement. Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
Priority Projects
- Security improvements needed to create a more secure campus environment.
Additional Projects, if Funds Become Available
- Repaint wallboard walls.
- Update Energy Management system as needed when new HVAC units are installed.
- Test and balance new HVAC units when installed.
- Update duct work as needed when HVAC units are replaced.
Utilization
67% Capacity: Moderately Utilized
Capacity
Pupil Count
Student Enrollment
420
Functional Capacity
627
Facility Condition Index
FCI: 3%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Visual and Performing Arts: Band hall is in good condition and provides a modern performing arts learning environment.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Actions to Improve the Educational Environment
The educational environment of the facility is in good condition; however, campus layout with multiple buildings is not conducive to modern learning strategies. Security enhancements to campus should be made. Minor maintenance improvements are needed.