Gonzales ISD - North Avenue Intermediate - Band Hall Building

  • Year Built
    2016
  • Square Footage
    3,724
  • Replacement Cost
    $2,094,308
  • Condition Budget
    $46,082
  • Facility Condition Index
    3%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: Exterior structure is in good condition.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Parking surfaces are in fair condition; cracking and damage was observed. Repair and reseal of parking areas is needed.
Good
Site: No issues observed.
Good
Doors: Interior and exterior doors are in good condition.
Good
Exterior/Interior Windows: Windows are in good condition.
Good
Roof: N/A

Interior

Fair
Interior Structure: Interior structure is in good condition. Repainting of wallboard walls is needed.
Good
ADA: ADA access to and within this building is good.
Good
Furnishing, Fixtures, Equipment: FFE is generally in good condition.
Good
Electrical: Electrical infrastructure is in good condition.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Flooring is in good condition.
Good
HVAC: No issues observed or reported; the HVAC unit that serves this site is nearing the end of its useful life and replacement should be anticipated. Aging mechanical infrastructure should be addressed at the time of unit replacement. Update duct work, web-based energy management system, test, and balance new HVAC units when installed.

Priority Projects

  • Security improvements needed to create a more secure campus environment.

Additional Projects, if Funds Become Available

  • Repaint wallboard walls.
  • Update Energy Management system as needed when new HVAC units are installed.
  • Test and balance new HVAC units when installed.
  • Update duct work as needed when HVAC units are replaced.

Utilization

67% Capacity: Moderately Utilized

Capacity

Pupil Count

Student Enrollment

420

Functional Capacity

627

Facility Condition Index

FCI: 3%

Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Visual and Performing Arts: Band hall is in good condition and provides a modern performing arts learning environment.
Poor
Security: See Safety & Security recommendations on the Facility Details page.

Actions to Improve the Educational Environment

The educational environment of the facility is in good condition; however, campus layout with multiple buildings is not conducive to modern learning strategies. Security enhancements to campus should be made. Minor maintenance improvements are needed.