Gonzales ISD - North Avenue Intermediate - 100-200-500 Buildings

  • Year Built
    1988
  • Square Footage
    37,150
  • Replacement Cost
    $14,816,163
  • Condition Budget
    $2,235,610
  • Facility Condition Index
    22%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Exterior structures are generally in good condition. Repair repaint stucco finishes on the 200 building and clean masonry on the 200 building. Repair and repaint undersides and poles of campus canopies/walkway covers. Provide canopy at parent pick-up student loading area. Exterior of portable building (storage) is in fair-to-poor condition.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Parking surfaces are in fair condition; cracking and damage was observed. Repair and reseal of parking areas is needed.
Fair
Site: Repair major cracks and uneven joints on campus sidewalks. Fill holes in playground surfaces. Repair and repainting of campus canopies and walkway covers is needed.
Good
Doors: Interior and exterior doors are generally in good condition.
Good
Exterior/Interior Windows: Windows are generally in good condition.
Good
Roof: N/A

Interior

Fair
Interior Structure: Interior structures are generally in good condition. Replace fiber wall coverings in hallways of 100 building. Repair vinyl baseboards in 200 building. Replace ceiling tiles in 200 building. Interior of portable building (storage) is in fair condition.
Plumbing: N/A
Fair
ADA: Generally good ADA access on campus. Improvements needed to interior room signage in 200 building and access to playgrounds & equipment.
Good
Furnishing, Fixtures, Equipment: FFE is generally in good condition. Replacement of mirrors in 200 building student restrooms is needed.
Fair
Electrical: Replace electrical and lighting infrastructure older than 30 years in 200 building.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Poor
Flooring: Carpeting in 100 building is in poor condition and needs replacement. Carpeting in 200 building needs cleaning.
Fair
HVAC: Much of the plumbing infrastructure in the 200 building is greater than 30 years old and should be considered for replacement. Sinks need to be added to art room. CO2 readings higher than 1000 ppm were measured in several areas; rebalancing of HVAC system is needed.

Priority Projects

  • Replace carpeting in 100 building and clean carpeting in 200 building.
  • Rebalance HVAC system to reduce CO2 levels in buildings.
  • Security improvements needed to create a more secure campus environment.
  • Provide ADA improvements on campus to increase access for students, staff, and visitors.

Additional Projects, if Funds Become Available

  • Repair and repaint stucco finishes and clean masonry on 200 building; repair and repaint undersides and poles of campus canopies & walkway covers.
  • Provide canopy at parent pick-up student loading area.
  • Asphalt parking lots need repair and resealing.
  • Replace fiber wall coverings in hallways of 100 building and repair vinyl baseboards in 200 building.
  • Replace mirrors in 200 building student restrooms.
  • Fill holes on playground surfaces.
  • Replace electrical and lighting infrastructure older than 30 years in 200 building.
  • Replace plumbing infrastructure older than 30 years in 200 building and add sinks to the art room.
  • Construct library addition to better serve campus population when campus is at or near full functional capacity.
  • Expand parking by 5 additional spaces to better serve campus population when campus is at or near full functional capacity.

Utilization

67% Capacity: Moderately Utilized

Capacity

Pupil Count

Student Enrollment

420

Functional Capacity

627

Facility Condition Index

FCI: 22%

Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Core Classrooms: Rooms are generally in good condition.
Visual and Performing Arts: Not applicable at this facility.
Cafeteria: Not applicable at this facility.
Occupant Flow: N/A
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Fair
Site Playgrounds/Extra Curricular: Filling of holes needed, along with ADA access to playgrounds and equipment.
Good
Special Education: Rooms are generally in good condition and satisfy basic special education program needs.
Physical Education: Not applicable at this facility.
Fair
Library: Library is undersized to adequately serve campus when at full capacity.
Good
Administration: Office area is in good condition and meets the needs of the campus.

Actions to Improve the Educational Environment

The educational environment of the facility is in good condition; however, campus layout with multiple buildings is not conducive to modern learning strategies. Security enhancements to campus should be made. Minor maintenance improvements are needed.