Breckenridge ISD - South Elementary School - Track & Field Stadium w/ Tennis Courts

  • Year Built
    1985
  • Square Footage
    5,640
  • Replacement Cost
    $1,418,430
  • Condition Budget
    $1,219,941
  • Facility Condition Index
    100%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Poor
Exterior Structure: Re-seal the building envelope by regrouting, repointing, re-sealing cracks in the masonry work, and refresh finished surface as needed. Observe repaired cracks in field storage, if movement persists an engineering study on the structure is recommended before substantial expenditure of funds. Check fasteners and flashings for tightness and seal on paneled walls, seal all openings, repair or replace damaged wall panels as needed. Refresh finished surfaces.
Poor
Foundation: Movement indicated by cracks in block wall of field storage, repaired cracks and observe, if movement persists an engineering study on the structure is recommended before substantial expenditure of funds. Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
Fair
Parking/Traffic: See detail in South Elementary School Main report.
Poor
Site: See detail in South Elementary School Main report.
Poor
Doors: Replace damaged doors and door hardware. Refresh finished door surface as needed.
Fair
Exterior/Interior Windows: Repair or replace damaged or missing window seals as needed.
Fair
Roof: Area 1: Repair roofing system to resolve any existing leaks on all structures. Repair or replace damaged soffit and facia, refresh finish surface. Repair existing and install additional gutter, downspouts, and splash blocks where needed. Continue maintenance as per manufacturer's recommendations. Observe roof at least annually and after any major weather event. As per 2023.09 update survey two items were completed; Stained ceiling tiles can be an indication for roof system leaks, repair roofing system to resolve any existing leaks. & Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed.

Interior

Fair
Interior Structure: Repair or replace wood or masonry wall structures to support loading as needed; observe for movement. Refresh high touched interior wall finished surfaces. Replace damaged and stained ceiling tiles as needed.
Poor
ADA: Facility has areas of compliance but there are areas needing updating for full ADA compliance. Facilities should have an ADA accessible route connecting compliant parking, compliant entrances to all facilities in public areas, bleachers, and compliant restrooms. Update door hardware, bleacher seating, walk paths, ramps, and signage is needed for ADA compliance. Update restroom accessories and stalls for ADA compliance as needed.
Fair
Furnishing, Fixtures, Equipment: Update cooking equipment as appropriate.
Fair
Electrical: Install LED lighting in structures. Install lighting controls in structures. Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Repair or replace aged and damaged resilient flooring.
Poor
HVAC: Install restroom wastewater drain lines in compliance with one of the state recognized Plumbing Codes. Replace HVAC units at or past their useful life expectancy. Install adequately sized water supply line to provide adequate water pressure all campus facilities.

Priority Projects

  • See Safety & Security recommendations on the Facility Details page.
  • Re-seal the building envelope by regrouting, repointing, re-sealing cracks in the masonry work, and refresh finished surface as needed.
  • Observe cracks in field storage for movement, if movement persists an engineering study on the structure is recommended before substantial expenditure of funds.
  • Check fasteners and flashings for tightness and seal on paneled walls, seal all openings, repair or replace damaged wall panels as needed.
  • Repair or replace wood or masonry wall structures to support loading as needed.
  • Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
  • Install restroom wastewater drain lines in compliance with one of the state recognized Plumbing Codes.
  • Install adequately sized water supply line to provide adequate water pressure all campus facilities.
  • Replace HVAC units at or past their useful life expectancy.
  • Field storage building has failing roofing system and needs major repair or replacement.
  • Repair roofing system to resolve any existing leaks on any of the structures.
  • Repair or replace damaged soffit and facia, refresh finish surface.
  • Repair existing and install additional gutter, downspouts, and splash blocks where needed.
  • Update door hardware, bleacher seating, walk paths, ramps, and signage is needed for ADA compliance.
  • Replace damaged doors and door hardware.

Additional Projects, if Funds Become Available

  • Replace portables structures providing concessions, restrooms, and training areas with permanent construction appropriate for multi sport use.
  • ADA compliant seating for bleachers with walkways and ramps.
  • Add directional signage, ADA compliant parking signage and ADA compliant room signage.
  • Repair tennis court surface, patch surface as needed.
  • Repair or replace aged and damaged resilient flooring.
  • Repair or replace damaged or missing window seals as needed.
  • Refresh finished door surface as needed.
  • Install LED lighting in structures.
  • Install lighting controls in structures.
  • Update cooking equipment as appropriate.
  • Refresh high touched interior wall finished surfaces.
  • Replace damaged and stained ceiling tiles as needed.
  • Refresh exterior finished surfaces.
  • Repair tennis court finish surface.
  • See Safety & Security recommendations on the Facility Details page.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Poor
Security: See Safety & Security recommendations on the Facility Details page.

Actions to Improve the Educational Environment

The Track and Field Stadium along with the Tennis Courts support the educational goals of the Breckenridge ISD. Security enhancements to facility and the South Campus should be made. Maintenance and updates are needed.