Breckenridge ISD - East Elementary School - Gym

  • Year Built
    1980
  • Square Footage
    5,003
  • Replacement Cost
    $3,895,745
  • Condition Budget
    $620,951
  • Facility Condition Index
    18%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Poor
Exterior Structure: Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the wall panels also repair or replace damaged wall panels as needed.
Good
Foundation: No issue observed or reported.
Fair
Parking/Traffic: In Main Report.
Poor
Site: If enclosed corridor is not constructed install ADA compliant walkway between Gym and Main building.
Poor
Doors: Replace weatherstripping and door sweeps on exterior doors. Update door hardware using a district master restricted keyway system, and refresh door and frame finish surfaces.
Good
Exterior/Interior Windows: No issues observed of reported.
Fair
Roof: Area 1: As per 2023.09 updtae survey roof replacmen is in progress. Install splash blocks at downspouts. Continue maintenance as per manufacturer's recommendations. Observe roof at least twice a year and after any major weather event.

Interior

Fair
Interior Structure: Install protective surface over exposed vinyl backed insulation. Consider installing some type of sound dampening. Refresh interior wall finished surfaces. Refresh finished surfaces.
Plumbing: N/A
Poor
ADA: Facility has areas of compliance but there are areas needing updating for full ADA compliance. Facilities should have an ADA accessible route connecting compliant parking, compliant building entrances to all campus buildings, public areas within the buildings, and compliant restrooms. Updating of door hardware and signage is needed for ADA compliance. If enclosed corridor is not constructed install ADA compliant walkway between Gym and Main building.
Good
Furnishing, Fixtures, Equipment: No issues observed or reported.
Fair
Electrical: Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Install LED lighting. Install data system. Review intercom system, update cabling and devices as needed. Install lighting control system.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Deep clean, reseal surface cracks, and refresh finished floor surface.
Poor
HVAC: Properly install wastewater lines serving water fountains. Replace HVAC units at or past their useful life expectancy. Replace heating units at or past their useful life expectancy. Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.

Priority Projects

  • See Safety & Security recommendations on the Facility Details page.
  • Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the wall panels also repair or replace damaged wall panels as needed.
  • Properly install wastewater lines serving water fountains.
  • Replace HVAC units and heating units at or past their useful life expectancy.
  • Updating of door hardware, refresh finished surface, and update signage is needed for ADA compliance.
  • If enclosed corridor is not constructed install ADA compliant walkway between Gym and Main building.
  • Replace weatherstripping and door sweeps on exterior doors.

Additional Projects, if Funds Become Available

  • Install conditioned air in Gym.
  • Install conditioned air in Gym.
  • Deep clean, reseal surface cracks, and refresh finished floor surface.
  • Install LED lighting.
  • Install data system.
  • Review intercom system, update cabling and devices as needed.
  • Install lighting control system.
  • Install splash blocks at downspouts.
  • Install protective surface over exposed vinyl backed insulation.
  • Consider installing some type of sound dampening.
  • Refresh interior wall finished surfaces.
  • See Safety & Security recommendations on the Facility Details page.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Core Classrooms:
Visual and Performing Arts:
Cafeteria:
Good
Occupant Flow: There are no internal halls, pedestrian traffic flow within the building is good.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Good
Physical Education: Gym is adequately sized for an elementary school campus and satisfies the basic physical education program needs.
Library:
Administration:

Actions to Improve the Educational Environment

The educational environment of the facility is in good condition. Security enhancements to facility should be made. Maintenance repairs are needed to reseal the building envelope and refresh finished surfaces.