Breckenridge ISD - Ag Farm - Ag Barns
- Year Built2004
- Square Footage5,450
- Replacement Cost$2,732,259
- Condition Budget$869,823
- Facility Condition Index38%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Poor
Exterior Structure: Check fasteners and flashings for tightness and seal on walls, repair or replace as needed.
Remove any material at the wall base, remove oxidation, apply inhibitor, reseal, or refresh surface.
Repair or replace damaged wall panels as needed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Consider installing hard surface paving, marked parking, marked ADA parking.
Poor
Site: See Safety & Security recommendations on the Facility Details page.
Poor
Doors: Replace door hardware as needed and refresh finish surface.
Exterior/Interior Windows: N/A
Fair
Roof: Area 1: Repair roofing system to resolve any existing leaks. Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed. Repair or replace skylights. Continue maintenance as per manufacturer's recommendations. Observe roof at least annually and after any major weather event.
Interior
Fair
Interior Structure: Clean and refresh interior finish surfaces as needed.
Plumbing: N/A
Poor
ADA: Campus and facility is not ADA accessible.
Provide ADA compliant route connecting compliant parking to compliant building entrances and to the public areas within the buildings.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Poor
Electrical: Install LED lighting.
Remove all obstruction restricting access to electrical panels.
Install lighting control system.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Clean, reseal floor as needed.
Good
HVAC: No issues observed.
Priority Projects
- Replace door hardware for ADA accessibility using a district master restricted keyway system, and refresh finish surfaces.
- Install card reader access control system.
- Install intrusion alarm system.
- Install fire alarm system.
- Install connectivity to network.
- See Safety & Security recommendations on the Facility Details page.
- Replace door hardware as needed.
- Remove all obstruction restricting access to electrical panels.
- Provide ADA compliant route connecting compliant parking to compliant building entrances and to the public areas within the buildings.
- Repair roofing system to resolve any existing leaks.
- Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed.
- Repair or replace skylights.
- Check fasteners and flashings for tightness and seal on walls, repair or replace as needed.
- Remove any material at the wall base, remove oxidation, apply inhibitor, reseal, or refresh surface.
- Repair or replace damaged wall panels as needed.
Additional Projects, if Funds Become Available
- Check fasteners and flashings for tightness and seal on walls, repair or replace as needed. Remove any material at the wall base, remove oxidation, apply inhibitor, reseal, or refresh surface. Repair or replace damaged wall panels as needed.
- Refresh exterior door finished surfaces as needed.
- Clean, refresh finish surface as needed
- Install LED lighting. Remove all obstruction restricting access to electrical panels.
- Install voice and data system.
- Connect facility to district system.
- Install lighting control system.
- Consider installing hard surface paving, marked parking, marked ADA parking.
- Remove debris from site, eliminate outside storage of materials.
- Secure covered storage for feed and tack.
- Clean, reseal floor as needed.
- Refresh the doors finish surfaces as needed.
- Install LED lighting.
- Install lighting control system.
- Consider installing hard surface paving, marked parking, marked ADA parking.
- Clean and refresh interior finish surfaces as needed.
- See Safety & Security recommendations on the Facility Details page.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Core Classrooms: N/A
Visual and Performing Arts: N/A
Cafeteria: N/A
Good
Occupant Flow: No issues observed.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular: N/A
Special Education: N/A
Physical Education: N/A
Library: N/A
Administration: N/A
Actions to Improve the Educational Environment
The educational environment of the facility is in fair condition. Security enhancements to facility should be made. Accessibility to facilities should be improved.