Breckenridge ISD - Breckenridge Main Campus - Buckaroo Stadium

  • Year Built
    1985
  • Square Footage
    2,545
  • Replacement Cost
    $1,780,505
  • Condition Budget
    $293,056
  • Facility Condition Index
    19%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Fair
Exterior Structure: Check fasteners and flashings for tightness and seal; re-caulk door and window frames as needed.
Poor
Foundation: Oxidation of bleacher support piping was observed in several locations along with several patches; recommend structure be inspected by design professional or replace bleachers with designed system.
Poor
Site: Compliant travel path along the back of and from visitor bleachers to concession and restrooms.
Poor
Doors: Repair oxidation damage on door frames. Replace door hardware for ADA accessibility and refresh finish surfaces.
Fair
Exterior/Interior Windows: Check fasteners and flashings for tightness and seal; re-caulk door and window frames as needed.
Fair
Roof: Area 1: As per 2023.09 update survey roof leaks have been addedssed. Continue maintenance as per manufacturer's recommendations. Observe roof at least annually and after any major weather event.

Interior

Poor
Interior Structure: Repair or replace wooden decking as needed in press box to return flooring to original elevation and stiffness. Install railings on stair and landings with no larger than 4-inch opening. Refresh finished surfaces as needed. Replace damaged and stained ceiling tiles as needed. Clean or refresh ceiling surfaces as needed.
Poor
ADA: Updates to seating and travel path from visitor's bleachers is needed. Home Press Box is just under the 500sf max before requiring compliant ADA access.
Fair
Furnishing, Fixtures, Equipment: Update concessions kitchen equipment as needed. Update restroom accessories as needed. Repair or replace damaged cabinets and countertops as needed.
Good
Electrical: As per 2023.09 update survey LED lighting in buildings is completed and data upgrades in progress.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: No issues observed.
Poor
HVAC: Replace HVAC units at or past their useful life expectancy.

Priority Projects

  • See Safety & Security recommendations on the Facility Details page.
  • Replace door hardware for ADA accessibility and refresh finish surfaces.
  • Add wheelchair seating and improve travel path from visitor's bleachers for ADA compliance.
  • Replace HVAC units at or past their useful life expectancy.
  • Recommend bleacher support structure be inspected by design professional or replace bleachers with commercially designed system.
  • Install railings on stair and landings with no larger than 4-inch opening.
  • Update door hardware using a district master restricted keyway system, and refresh finish surfaces.

Additional Projects, if Funds Become Available

  • Bleacher and press box replacement
  • Relocate Stadium, New Facility with track.
  • Install additional wheelchair and companion seating.
  • Artificial turf replacement when needed
  • Repair oxidation damage on door frames.
  • Update concession kitchen equipment as needed.
  • Update restroom accessories as needed.
  • Repair or replace damaged cabinets and countertops as needed.
  • Check fasteners and flashings for tightness and seal on walls; re-caulk door and window frames as needed.
  • Repair or replace wooden decking as needed in press box to return flooring to original elevation and stiffness.
  • Refresh finished surfaces as needed.
  • See Safety & Security recommendations on the Facility Details page.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Fair
Occupant Flow: Repair uneven surfaces to reduce potential tripping hazards.
Poor
Security: See Safety & Security recommendations on the Facility Details page.

Actions to Improve the Educational Environment

Buckaroo Stadium supports the district educational goals.