Breckenridge ISD - Breckenridge Main Campus - Ag Classrooms and Shop with Storage
- Year Built1978
- Square Footage10,104
- Replacement Cost$6,699,477
- Condition Budget$1,477,390
- Facility Condition Index26%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Poor
Exterior Structure: Check fasteners and flashings for tightness and seal on walls panels, repair or replace damaged wall panels as needed.
Remove any material or vegetation against the wall.
Refresh finish surfaces.
Poor
Foundation: Creating positive storm water drainage away from foundation.
Repair and re-seal minor slab cracking in classroom, observe for movement, if worsens recommend engineering study to determine cause and proper mitigation.
Parking/Traffic: N/A
Site: N/A
Fair
Doors: Repair or replace doors and door hardware as needed to properly function and comply with ADA accessibility.
Replace weatherstripping and door sweeps on exterior doors as needed.
Refresh interior and exterior door finished surfaces as needed.
Poor
Exterior/Interior Windows: Repair or replace damaged or missing window seals and re-caulk frame as needed.
Fair
Roof: Area 1: As per 2023.09 update survey roof replaced 8/2023. Trim all vegetation overhanging roof. Install splash blocks at downspouts. Continue maintenance as per manufacturer's recommendations. Observe roof at least annually and after any major weather event.
Interior
Fair
Interior Structure: Refresh finished wall surface.
Clean and refresh finished ceiling surfaces.
Plumbing: N/A
Fair
ADA: Maintain ADA specified clearance and plumbing fixtures.
Update door hardware and restroom accessories.
Poor
Furnishing, Fixtures, Equipment: Install proper ventilation for each welding station.
Update restroom accessories and stalls for ADA compliance as needed.
Repair or replace aged or damaged cabinets and countertops as needed.
Replace damaged moveable furnishings as needed.
Fair
Electrical: Install LED lighting.
Remove all obstruction restricting access to electrical panels; Label floor if needed.
Install blanks or breaker in shop electrical panel.
As per 2023.06 update survey data cabling upgrade is underway.
Review intercom system, update cabling and devices as needed.
Install lighting control system.
Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Deep clean, repair or replace aged and damaged resilient flooring.
Repair cracking of finished concrete surfaces and re-seal where needed.
Poor
HVAC: Repair damaged plumbing fixtures as needed.
Replace HVAC units at or past their useful life expectancy.
Update duct work as needed when HVAC units are replaced.
Update Energy Management system as needed when new HVAC units are installed.
Test and balance new HVAC units when installed.
Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Priority Projects
- See Safety & Security recommendations on the Facility Details page.
- Remove all obstruction restricting access to electrical panels add blanks in open breaker spaces; Label floor if needed.
- Review intercom system, update cabling and devices as needed.
- Install proper ventilation for each welding station.
- Trim all vegetation overhanging roof.
- Install splash blocks at downspouts.
- Creating positive storm water drainage away from foundation.
- Repair and re-seal minor slab cracking in classroom, observe for movement, if worsens recommend engineering study to determine cause and proper mitigation.
- Check fasteners and flashings for tightness and seal on walls panels, repair or replace damaged wall panels as needed.
- Repair or replace damaged or missing window seals and re-caulk frame as needed.
- Remove any material or vegetation against the wall.
- Refresh exterior finish surfaces.
- Repair damaged plumbing fixtures as needed.
- Replace HVAC units at or past their useful life expectancy.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
Additional Projects, if Funds Become Available
- Consider relocation classrooms onto main campus or install secure vestibule entrance.
- Consider relocation classrooms onto main campus or building an enclosed connector if ROW could be closed.
- Deep clean, repair or replace aged and damaged resilient flooring.
- Repair cracking of finished concrete surfaces and re-seal where needed.
- Install LED lighting and lighting control system.
- Update restroom accessories and stalls for ADA compliance as needed.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Refresh finished wall surface.
- Replace damaged and stained ceiling tiles as needed.
- Clean and refresh finished ceiling surfaces.
- See Safety & Security recommendations on the Facility Details page.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Core Classrooms: Classrooms are generally in good condition.
Visual and Performing Arts:
Cafeteria:
Poor
Occupant Flow: Pedestrian traffic flow within the building is good.
There is no internal hall to access the Ag classrooms or shop.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Special Education:
Physical Education:
Library:
Administration:
Actions to Improve the Educational Environment
The educational environment of the facility is in good condition. Maintenance repairs are needed to reseal the building envelope, refresh finished surfaces, and improving ventilation for welding. Security enhancements to facility should be made.