Breckenridge ISD - Breckenridge Main Campus - Cafeteria, Home Economics, and Life Skills

  • Year Built
    1956
  • Square Footage
    8,204
  • Replacement Cost
    $6,743,211
  • Condition Budget
    $4,205,495
  • Facility Condition Index
    72%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Poor
Exterior Structure: Re-seal the building envelope by regrouting or repointing the masonry work and replacing cracking or missing expansion joint caulking as needed.
Good
Foundation: No issue observed or reported.
Parking/Traffic: N/A
Site: N/A
Poor
Doors: Replace door hardware for ADA accessibility and refresh finish surfaces.
Poor
Exterior/Interior Windows: Repair broken windows. Replace old leaking window system with energy efficient window systems.
Fair
Roof: Area 1: As per 2023.09 update survey roof replacemnt is in progress. Trim all vegetation overhanging roof. Continue maintenance as per manufacturer's recommendations. Observe roof at least annually and after any major weather event.

Interior

Fair
Interior Structure: Repair or replace damaged walls, refresh finished surfaces where needed. Repair damaged ceilings, refresh finished surfaces, replace damaged and aged ceiling tiles with 2X2 grid and tiles.
Plumbing: N/A
Fair
ADA: ADA improvements have been made to facility, progress towards full compliance should continue as renovations are made. Facilities should have an ADA accessible route connecting compliant parking, compliant building entrances to all campus buildings, public areas within the buildings, and compliant restrooms.
Poor
Furnishing, Fixtures, Equipment: Update aging and maintenance prone kitchen equipment. Repair or replace aged or damaged cabinets and countertops as needed. Replace damaged moveable furnishings as needed.
Fair
Electrical: Install LED lighting. Remove all obstruction restricting access to electrical panels; Label floor if needed. As per 2023.09 update survey updating cabling, servers, APs, switches and routers is in progress. Install lighting control system. Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Fair
Flooring: Deep clean, repair or replace aged and damaged soft surface flooring. Deep clean, repair or replace aged and damaged resilient flooring. Repair cracking of finished concrete surfaces and re-seal where needed.
Fair
HVAC: Update to ADA compliant plumbing fixtures. Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.

Priority Projects

  • See Safety & Security recommendations on the Facility Details page.
  • Kitchen addition.
  • Repair broken windows.
  • Replace door hardware for ADA accessibility and refresh finish surfaces.
  • Re-seal the building envelope by regrouting or repointing the masonry work and replacing cracking or missing expansion joint caulking as needed.
  • Trim all vegetation overhanging roof.
  • Update aging and maintenance prone kitchen equipment.

Additional Projects, if Funds Become Available

  • Kitchen addition.
  • Vestibule.
  • Remodel of Home Economics and Life Skills.
  • Remodel of educational use area of building.
  • Deep clean, repair or replace aged and damaged soft surface flooring.
  • Deep clean, repair or replace aged and damaged resilient flooring.
  • Repair cracking of finished concrete surfaces and re-seal where needed.
  • Replace old leaking window system with energy efficient window systems.
  • Install LED lighting.
  • Remove all obstruction restricting access to electrical panels; Label floor if needed.
  • Install lighting control system.
  • Repair or replace aged or damaged cabinets and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Repair or replace damaged walls, refresh finished surfaces where needed.
  • Repair damaged ceilings, refresh finished surfaces, replace damaged and aged ceiling tiles with 2X2 grid and tiles.
  • See Safety & Security recommendations on the Facility Details page.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Fair
Core Classrooms: Classroom area is generally in good condition although cooking area and classroom area appears to be crowed with little circulation space available.
Visual and Performing Arts:
Poor
Cafeteria: Kitchen is undersized to adequately serve campus at existing capacity and substantially undersized when campus is at or near full functional capacity. (General standard for kitchen is 3.5sf per meal served.)
Fair
Occupant Flow: No internal connecting halls.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Site Playgrounds/Extra Curricular:
Fair
Special Education: Main room appears to be large and not designed for existing use, area is generally in good condition although the restroom, kitchen, and therapy area is in fair to poor condition needing updating of finished surfaces.
Physical Education:
Library:
Administration:

Actions to Improve the Educational Environment

Overall the educational environment of the facility is in good to fair condition. Security enhancements to facility should be made. Maintenance repairs are needed to reseal the building envelope, refresh finished surfaces, and update technology.