Connally ISD - High School - Football Athletics

  • Year Built
    2007
  • Square Footage
    27,193
  • Replacement Cost
    $22,737,273
  • Condition Budget
    $1,981,705
  • Facility Condition Index
    11%
Condition Assessment
System Rating Score
  • Good

  • Fair

    (or will require attention in near future 3-10 years)

  • Poor

    (or will require attention now 0-2 years)

Exterior

Good
Exterior Structure: No issues observed or reported.
Poor
Foundation: Possible foundation movement observed at Ticket Office. Consider consulting with an engineer to determine cause and solution for building movement.
Fair
Parking/Traffic: Apply slurry coat and restripe parking lots. Additional ADA spaces are needed at rear football lot after striping.
Good
Site: No issues observed or reported.
Fair
Doors: Refinish exterior metal doors as necessary. Refinish interior wooden doors as necessary.
Fair
Exterior/Interior Windows: Replace windows at press box. Evidence of water intrusion was observed around the windows. At a minimum, reseal around the windows and window frames.
Fair
Roof: Area 1 - Football Press Box metal roof is in good condition . The roof should be inspected at least semi-annually and after every significant weather event. Area 2 - Multipurpose and Ticket Office modified bitumen roof is in fair condition and is at the end of useful life expectancy. The roof should be planned for replacement. Evidence of roof leaks were observed. Until replacement can happen, continue routine inspections at least semi-annually and after every significant weather event. Area 3 - Ticket Office metal roof is in good condition. The roof should be inspected at least semi-annually and after every significant weather event.

Interior

Fair
Interior Structure: Refinish interior masonry walls as necessary. Wood paneling wall system in press box shows evidence of water leaks and should be replaced. Refinish damaged wallboard ceilings as necessary. Replace damaged lay-in ceiling tile as necessary.
Good
Plumbing: No issues observed or reported.
Good
ADA: Facility appears compliant with ADA.
Good
Furnishing, Fixtures, Equipment: Replace movable furnishings as needed.
Fair
Electrical: Update lighting fixtures to LED fixtures.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Replace carpet at end of useful life expectancy in press box and multi-purpose building. Replace older, worn, and damaged resilient floor tile.
Poor
HVAC: Replace HVAC system components at or beyond useful life expectancy.

Priority Projects

  • See Safety & Security recommendations on the Facility Details page.
  • Possible foundation movement observed at Ticket Office, consider consulting with an engineer to determine cause and solution for building movement.
  • Replace HVAC system components at or beyond useful life expectancy.
  • Modified Bitumen roofing is in fair condition and is at the end of useful life expectancy, roof leaks were observed, and the roof should be planned for replacement.
  • Replace windows at press box, at a minimum, reseal around the windows and window frames.

Additional Projects, if Funds Become Available

  • Modified bitumen roof is past useful life expectancy and should be planned for replacement.
  • New Scoreboard
  • Refinish interior masonry walls as necessary.
  • Wood paneling wall system in press box shows evidence of water leaks and should be replaced.
  • Refinish damaged wallboard ceilings as necessary.
  • Replace damaged lay-in ceiling tile as necessary.
  • Apply slurry coat, repair moderate damage, and restripe parking lots with additional ADA spaces at football lot.
  • Replace movable furnishings as needed.
  • Update lighting fixtures to LED fixtures.
  • Refinish exterior metal doors as necessary.
  • Refinish interior wooden doors as necessary.
  • Replace carpet at end of useful life expectancy in press box and multi-purpose building.
  • Replace older, worn, and damaged resilient floor tile.
  • Inspect and update football electrical system.
  • Replace football scoreboard.
  • Update lecture hall seating.
  • Update weightroom equipment.
Educational Adequacy Assessment
System Rating Score
  • Adequate Spaces

  • Needs Improvement

  • Not Adequate

Good
Occupant Flow: Occupant flow within the facility appears adequate.
Poor
Security: See Safety & Security recommendations on the Facility Details page.

Actions to Improve the Educational Environment

The educational environment of the football athletic facilities is in good condition and supports the educational mission of the district.